© 2013/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0329-001 Rev F
File Generated July 3, 2013
Page 15
ZS SPAN INSTALLATION MANUAL FOR RAIL-BASED APPLICATIONS - U.S.
3.1.1 Zepulator Layout Example
After all information is entered or selected, click the
Update
button on the
Layout
tab to see a
suggested layout similar to the one shown below. Note that the Zepulator optimizes the layout to
minimize the number of roof penetrations.
Figure 3.4 Example Zepulator Array Layout (ZS Span, US)
The array layout accounts for each ZS Span component listed on the Bill of Material.
NOTE:
In cases where a Cam Foot coincides with an Interlock location, you may need
to substitute a Hybrid Interlock. However, shifting the array slightly left or right
(in the direction perperpendicular to the Spanner Bar direction) can sometimes
eliminate the need for Hybrid Interlocks altogether.
The Zepulator does not show Hybrid Interlocks on the layout, although it will
include Hybrid Interlocks in Additional Truck Stock to ensure adequate hard-
ware supply if needed.
Ground Zep
Tile Hook roof
attachment
PV module
Rafters
Interlock
Down-roof
The Zepulator centers the array in the specified
roof mounting area.
Cam Foot