© 2013/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0329-001 Rev F
File Generated July 3, 2013
Page 72
ZS SPAN INSTALLATION MANUAL FOR RAIL-BASED APPLICATIONS - U.S.
Hybrid Interlocks, Continued
Using the Zep Tool or Flat Tool to
provide leverage as needed, attach the
Hybrid Interlock to the PV module
frame or Array Skirt.
Connecting the Hybrid Interlock to the Cam Foot Base
Spin the Rockit to remove it from
the threaded stud and the Cam
Foot base.
Insert the Cam Foot stud into one of the holes on the
Hybrid Interlock, and spin the Hybrid Interlock to attach it.
Installing the Hybrid Interlock
Secure Cam Foot base to Big Foot using Flat Tool, turning 100 degrees.
Keep the center of each Rockit minimum 2 inches from module corner.
i
ii
i
ii