© 2013/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0329-001 Rev F
File Generated July 3, 2013
Page 29
ZS SPAN INSTALLATION MANUAL FOR RAIL-BASED APPLICATIONS - U.S.
4.4.4 Physical Gaps Between Sub-Arrays
Thermal Expansion Joints only work along the axis of the Interlock. Thermal expansions running
along the other axis (parallel to the module drop-in direction) require a physical break between the
sub-arrays.
At a minimum, the gap should be at least 4 inches. However, a gap of 12 inches is recommended
for ease of servicing.
Figure 4.12 North South Drop-In, Thermal Expansion Gap
Figure 4.13 East-West Drop-In, Thermal Expansion Gap
Physical gap recommended
minimum 12 inches
Physical gap recommended
minimum 12 inches