Page 4-18
REPLACING THE CENTER BASE
P erform the f o l l o w i n g st eps only i f y o u d e t e r m i n e d
that you must replace the center base.
Refer to Illu stration Bo ok, Page 14, Pictorial 4-21 for
the follow in g steps,
•
Rem o v e t h e f o ur ¹ 6 x '/8 " s e lf -tappi ng screws
(two on each side) that hold the slide rails to
t he center base. Then u n h oo k th e tw o s p r i n g s
and set the slide rails and har d w are aside tem-
porarily.
Pictorial.
holes BL and BN.
attached to them, at locations BL and BN .
•
Use a ¹ 6 x ' / 8 " self-tapping screw an d p r e -tap
•
Mo u n t t h e ¹ 6 s o l d e r l u g s, that have the springs
Refer to Ill u stration Bo ok, Page 14, Pictorial 4-22 for
the follow in g steps.
•
P osi ti o n t h e n e w c e n t er b ase as shown i n t h e
•
Posi ti o n t h e m a s k b r a c ket w i t h t h e p r e s sed-in
n uts up as sh ow n an d m o u n t i t a t B P an d B R
w ith tw o 6 - 3 2 x ' / 8 " s c r ews, T ur n t h e s c r ew s
in only about '/4".
•
Rem o v e t h e t w o ¹ 6 x ' / 8 " s e l f - tappi ng s crews
at BL and BN. Then set the screws, solder lugs,
a nd spri ngs aside t e m p o r ar i ly . N O T E : D o n o t
unhook the springs from the solder lugs.
•
Use a ¹ 8
x Vz " s h e e t m e ta l s c rew t o p r e - t ap
holes BS and BT.
•
R em o v e t h e t w o 6 - 3 2 x '/ 8 " s crews f r om l o c a -
tions BR and BP. Then remove the mask brack-
e t and set it and the screws aside temporari l y ,
•
R em o v e t h e 6 - 32 x 1 ~ /8" screws from l o c a tions
AG, AH , A I , an d A J an d t h e ¹ 8 x 1'/ z " s h eet
metal screw from l o cation AK . Set these screws
aside temporari ly . N O TE: These are the screws
that hold th e center base to the base and chas-
•
M o u n t th e c i r c u i t b o a r d a n d s h i e l d o n t o t h e
center base at BS an d B T w i t h t w o ¹ 8 x V
2"
sheet metal screws. Push the shield forw ard be-
fore you tighten the hardw are.
Refer to Illu stration Bo ok, Page 15, Pictorial 4-23 for
the f
ollowing
steps.
•
P lace a cloth on y ou r w o r k s u r f ace and lay t h e
s1s.
CRT mask face down .
•
Rem o v e t h e t w o ¹ 8 x '/ 2" s h e et m e t al s crews
from locations BT and BS. Set these screws and
t he ground strap aside temporari l y ,
•
Slide the mask bracket over the mask at BP and
B R. Also m ake sure that th e c i r c ui t b o ar d a n d
shield i s o n t h e i n s i d e o f t h e s u p p or t b r a ck et
that is mou n ted at the u p per r i ght h an d c o r n er
o f the C RT . P u s h t h e b ase d o w n a s f a r a s i t
will go and tighten the screws at BP and BR.
•
P u l l th e c e n t e r b a se away f r om t h e C RT f r o n t
panel assembly. Then discard the center base.
N OTE: The v i d e o d r i v e r c i r c ui t b o ar d w i l l r e -
m ain fastened to th e f r on t p a nel assembly. Be
c areful you do not d amage this assembly w h i l e
you perform the foll o w i n g steps.
Summary of Contents for Z-100 Series
Page 2: ...Z 10 eri es User s Manual Winchester u lcm ent I aa systems...
Page 84: ...7 4 q 1 a m...
Page 88: ......
Page 90: ...Page 2 2...
Page 118: ...Page 4 26...
Page 148: ......