Preparations for start-up
61211-1310402
CONTURA
6-5
1 Set screws
3
Slide the frame supports along the guide profile out of the measur-
ing area.
The qualification points of the stylus system holders must remain
within the measuring range.
4
Align the profile rail (< 0.1 mm/m).
5
Retighten the set screws.
Fastening the changer rack with mounting brackets
(option)
For special applications, it is possible to fasten the changer rack using
mounting brackets. This makes a continuous adjustment of the foot pro-
file in the Y axis possible.
1 Mounting bracket with screw M12, DIN 912
1
Hook the first mounting bracket into the side longitudinal slot of the
foot profile and screw the mounting bracket onto the measuring ta-
ble.
2
On the opposite side, loosen the set screws on the spacer and the
frame support.
Summary of Contents for CONTURA
Page 55: ...4 61211 1310402 CONTURA 4 1 Technical data This chapter contains CMM 4 2 Technical data...
Page 62: ...CMM 4 8 61211 1310402 CONTURA...
Page 68: ...Installation 5 6 61211 1310402 CONTURA...
Page 90: ...Setting up the workpiece 6 22 61211 1310402 CONTURA 200 100 100 200 100 600 Size 9 12 Z...
Page 91: ...Setting up the workpiece 61211 1310402 CONTURA 6 23 600 100 600 100 600 100 Size 9 18 Z...
Page 92: ...Setting up the workpiece 6 24 61211 1310402 CONTURA 600 100 600 100 800 100 Size 12 18 Z...
Page 122: ...Terminating the measuring operation 7 26 61211 1310402 CONTURA...
Page 130: ...Service features 8 8 61211 1310402 CONTURA...
Page 150: ...2Glossary 2 61211 1310402 CONTURA...
Page 156: ...6Alphabetic index 6 61211 1310402 CONTURA...
Page 157: ......
Page 158: ...CONTURA Operating instructions 2022 04 29 61211 1310402...