![background image](http://html1.mh-extra.com/html/zehnder-pumpen/kompaktboy-doppel/kompaktboy-doppel_operating-manual_3324126087.webp)
Kompaktboy Double
en
English
87
Component
Activity
Type plate
check for readability
Outlet and inlet connections
Check for tight fit and leaks
It has to be ensured that the weight of the pipelines does not rest
on the collecting tank
Check of the elastic pipe coupling for proper fit and possibly wear
and tear
Inlet gate valve
Check condition and function
Lubricate the adjusting spindle
Shut-off valves pressure line
Check condition and function
Lubricate the adjusting spindle
Collecting tank
Check the condition – check for cracks and deformations
Clean the collecting tank
Check valve
Check the condition and function of the check valve – clean, if
necessary
Level control
Dismount and clean the pitot tube
Check the control line – check connections on the tank and on
the control
7 Maintenance and repair
Under normal use, the lifting unit Kompaktboy Double requires only a minimum of main-
tenance. We recommend that the plant operating company carries out a monthly visual
inspection of the lifting unit. While doing so, attention has to be paid for abnormalities, e.g.
XQXVXDOUXQQLQJQRLVHVRIWKHFHQWULIXJDOSXPS,ILUUHJXODULWLHVDUHQRWHGTXDOL¿HGVWDႇ
has to be called in.
$OOIXUWKHUPDLQWHQDQFHZRUNVPXVWEHFDUULHGRXWE\DXWKRULVHGTXDOL¿HGVWDႇ
i
According to DIN EN 12056-4, lifting units have to be regularly checked within the fol-
lowing time intervals:
every 12 months in case of installation in detached houses
every 6 months in apartment blocks
every 3 months in case of installation in commercial and industrial enterprises
7KHUHJXODUFKHFNVKDYHWREHFDUULHGRXWE\DXWKRULVHGTXDOL¿HGVWDႇDQGPXVW
comprise both the maintenance of electrical and mechanical components. Mainte-
nance works have to be documented in the plant manual.
In order to guarantee permanent operational safety of the lifting unit, we recommend to
conclude a maintenance agreement.
The following table provides and overview of maintenance works which have to be ex-
HFXWHGE\TXDOL¿HGVWDႇ
ª
Chapter
´6HOHFWLRQDQGTXDOL¿FDWLRQRISHUVRQV³
Summary of Contents for KOMPAKTBOY DOPPEL
Page 21: ...Kompaktboy Doppel Deutsch 21 Einbaubeispiel zur Absch tzung des Platzbedarfs der Hebeanlage...
Page 44: ...Kompaktboy Doppel Deutsch 44 9 2 1 Abmessungen Kompakboy Doppel 1 1 und 1 5...
Page 45: ...Kompaktboy Doppel Deutsch 45 9 2 2 Abmessungen Kompakboy Doppel 3 0...
Page 46: ...Kompaktboy Doppel Deutsch 46 10 Ersatzteilliste...
Page 92: ...Kompaktboy Double en English 92 9 2 1 Dimensions of the Kompaktboy Double 1 1 and 1 5...
Page 93: ...Kompaktboy Double en English 93 9 2 2 Dimensions of the Kompaktboy Double 3 0...
Page 94: ...Kompaktboy Double en English 94 10 List of spare parts...
Page 140: ...Kompaktboy Double fr Fran ais 140 9 2 1 Dimensions Kompakboy Double 1 1 et 1 5...
Page 141: ...Kompaktboy Double fr Fran ais 141 9 2 2 Dimensions Kompakboy Double 3 0...
Page 142: ...Kompaktboy Double fr Fran ais 10 Liste de pi ces de rechange...