Kompaktboy Double
en
English
77
6.
Z
Put one flange seal DN 100 each on the connec-
tion flanges of the ball check valves.
7.
Z
Put on the Y-pipe. While doing so, arrange the
holes/threaded holes congruently.
Create the screw connections with 4 screws
M16x90 and
4 nuts M16 between the check valves and the
Y-pipe and equally tighten crosswise
8.
Z
3XWWKHÀDQJHVHDO'1RQWKHFRQQHFWLRQ
ÀDQJHRIWKH<SLSH
9.
Z
3XWRQWKHDGDSWHUÀDQJHDQGFUHDWH
screw con-
nections with 4 screws M16x100 and 4 nuts M 16
between the Y-pipe and the adapter flange and
equally tighten crosswise.
Summary of Contents for KOMPAKTBOY DOPPEL
Page 21: ...Kompaktboy Doppel Deutsch 21 Einbaubeispiel zur Absch tzung des Platzbedarfs der Hebeanlage...
Page 44: ...Kompaktboy Doppel Deutsch 44 9 2 1 Abmessungen Kompakboy Doppel 1 1 und 1 5...
Page 45: ...Kompaktboy Doppel Deutsch 45 9 2 2 Abmessungen Kompakboy Doppel 3 0...
Page 46: ...Kompaktboy Doppel Deutsch 46 10 Ersatzteilliste...
Page 92: ...Kompaktboy Double en English 92 9 2 1 Dimensions of the Kompaktboy Double 1 1 and 1 5...
Page 93: ...Kompaktboy Double en English 93 9 2 2 Dimensions of the Kompaktboy Double 3 0...
Page 94: ...Kompaktboy Double en English 94 10 List of spare parts...
Page 140: ...Kompaktboy Double fr Fran ais 140 9 2 1 Dimensions Kompakboy Double 1 1 et 1 5...
Page 141: ...Kompaktboy Double fr Fran ais 141 9 2 2 Dimensions Kompakboy Double 3 0...
Page 142: ...Kompaktboy Double fr Fran ais 10 Liste de pi ces de rechange...