User’s Manual 1PH HYD3000-HYD6000-ZP1
Rev. 1.0 01/09/2023
Identification: MD-AL-GI-00
Rev. 1.1 of 27/01/2023 - Application: GID
124/193
2.
After pulling up the AC switch, the countdown will start according to the country code set (for CEI021-
Internal, it will be 300s) to reconnect to the grid. During this period, check that the household loads
are only powered by the grid and that there are no other power flows from either the photovoltaic
system or the battery.
2.
Once the countdown is over, the batteries will start to deliver power according to the availability
towards the utility, trying to reset the consumption from the grid. During this period, check that the
3.
value of the consumption remains constant
*
as the power supplied by the battery increases during
discharge.
4.
The power taken from the grid should decrease by an amount equal to the power supplied by the
battery.