User’s Manual 1PH HYD3000-HYD6000-ZP1
Rev. 1.0 01/09/2023
Identification: MD-AL-GI-00
Rev. 1.1 of 27/01/2023 - Application: GID
63/193
Note:
Both MPPT inputs of the inverter should be populated, even if the system only has one string. If the strings are
arranged in parallel, it is recommended to use a Y or T connection cable to double the input currents from the PV
field and to populate both MPPT inputs of the inverter, as shown in the figure. If the string arrangement is
independent, simply connect the two strings to the two MPPTs of the inverter.
Figure 36 - Y-branch connection cable for solar panels