Note:
If 24 V is present on the MV
terminal without a call for heat, an alarm
appears and the fan output energizes. If
this condition occurs for 6 min an alarm
appears, and remains, until the alarm
condition is cleared.
5. At any time, if 24 V is lost on the LIMIT
terminal, the FAN output for indoor fan
operation is energized. If 24 V is lost on the
LIMIT input 3 times in 1 hr, an alarm appears
and the FAN output is energized. The heating
H1 and H2 outputs are de-energized until the
alarm is cleared.
Two Stage gas heat Ignition
Control Board function
Ignition Control Board on standby
The Ignition Control Board (ICB) has all outputs de-
energized and monitors the thermostat and flame
sense. The ICB resets ignition trial and flame loss
counters. The ICB begins a call for heat when W1 is
energized at the Unit Control Board (UCB). The ICB
ignores W2 until ignition has been established.
Pressure switch proving
The ICB energizes the induced draft motor and
waits for the low pressure switch to close. When the
low pressure switch closes, the control begins Pre-
purge period. If the call for heat is lost, the control
de-energizes the inducer without post-purge and
returns to standby.
If the low pressure switch does not close within 10
seconds of inducer energizing, the control flashes
"2" on the LED. If the pressure switch does not close
within 5 minutes of inducer energizing, the control
shuts off the inducer for 30 seconds, then energizes
the inducer for another 5 minutes to try to close the
pressure switch. This cycle continues indefinitely
until either the pressure switch is proved closed, or
the call for heat ends.
Pre-purge
The ICB monitors the low pressure switch and
ensures it remains closed during pre-purge. If
the pressure switch opens, the control returns to
pressure switch proving mode. The control waits
for a 15 second pre-purge period, then begins the
ignition trial.
Ignition trial period
The ICB energizes the main gas valve, second stage
gas valve and spark outputs for a 10 second ignition
trial. The control de-energizes the spark when flame
is sensed and enters a flame stabilization period.
If flame is not established within the ignition trial
period, the control de-energizes the spark and gas
valve and checks for maximum number of ignition
trials. The ICB has a maximum number of 3 ignition
trials. If the control has attempted the maximum
number of ignition trials within the same call for
heat without flame, the control will lockout flashing
"4" on the LED. If the control has attempted less
than maximum ignition trials, it begins an inter-
purge period before attempting another ignition
trial.
If the call for heat is lost during an ignition trial
period, the control immediately de-energizes
spark and gas. The control runs the inducer motor
through a post purge period before de-energizing.
If the pressure switch is lost during an ignition trial
period, the control immediately de-energizes spark
and gas. The control begins pressure switch proving
before an inter-purge and re-ignition attempt.
Flame stabilization period
If a flame is detected during the Ignition Trial
Period, the ICB then enters the flame stabilization
period. If a flame is not detected in 2 seconds,
the main valve is de-energized and a retry
operation begins. The flame stabilization period
lasts 10 seconds. Flame detection must be lost
for 2 seconds during flame stabilization for the
main valve to be de-energized. When the flame
stabilization period ends, a loss of flame detection
for 3/4 seconds results in the main valve being de-
energized.
If flame is lost during the flame stabilization period,
the control counts it as a flame loss and retries
ignition or locks out as described in Low heat
section below.
Main Burner operation
High heat warm-up
Two stage models run high heat for the first
30 seconds following flame stabilization period
regardless of W2 demand. If W2 is not energized
at the end of this 30 second period the control de-
energizes the high gas output. If W2 is energized
the control remains on high heat.
Low heat
The ICB keeps the main gas valve and induced draft
motor energized while continuously monitoring the
call for heat, low pressure switch, and flame status.
Installation Manual: YORK
®
Sun™ Select YV28 to YV50
85
Johnson Controls Ducted Systems
Summary of Contents for Sun Select YV28
Page 2: ...Tested in accordance with ...
Page 105: ...Installation Manual YORK Sun Select YV28 to YV50 105 Johnson Controls Ducted Systems ...
Page 106: ...Installation Manual YORK Sun Select YV28 to YV50 106 Johnson Controls Ducted Systems ...
Page 107: ...Installation Manual YORK Sun Select YV28 to YV50 107 Johnson Controls Ducted Systems ...
Page 108: ...Installation Manual YORK Sun Select YV28 to YV50 108 Johnson Controls Ducted Systems ...
Page 109: ...Installation Manual YORK Sun Select YV28 to YV50 109 Johnson Controls Ducted Systems ...