
19
4. Operating procedures
Operating sequence (Basic operation)
1) Turn breaker power on. (Breaker is
“ON”.)
Turn power of the breaker on.
The controller screen displays the initial display for several seconds and then year, month, day,
and the current time will be displayed on the Guide screen.
FIXED TEMP.
PAUSE
AUTO
START
AUTO
STOP
PROGRAM
PAUSE
TEMP. SET
TIME SET
ENTER
CANCEL
TIMER
SET TEMP.
℃
MEASURED TEMP.
HR
MIN.
HEATER
TIME
CLOCK
CLOSED TIME
RUN
STOP
RETURN-2SEC
REPEAT
SET
PROGRAM
STEP
PROGRAM
3~
PROGRAM
2
PROGRAM
1
GUIDE
FUNCTION
1・2
KEY
LOCK
RETUREN-2SEC
DEFROST
POWER
FIXED TEMP.
PAUSE
AUTO
START
AUTO
STOP
PROGRAM
PAUSE
TEMP. SET
TIME SET
ENTER
CANCEL
TIMER
SET TEMP.
℃
MEASURED TEMP.
HR
MIN.
HEATER
TIME
CLOCK
CLOSED TIME
RUN
STOP
RETURN-2SEC
REPEAT
SET
PROGRAM
STEP
PROGRAM
3~
PROGRAM
2
PROGRAM
1
GUIDE
FUNCTION
1・2
KEY
LOCK
RETUREN-2SEC
DEFROST
POWER
Note: When the Power Failure
Compensation
function
is
“ON”, the controller will be
activated at a status before
power was shut off when
breaker power is turned on.
Also refer to the section on
FUNCTION 2
“Power Failure
Compensation function
” in the
separate
“Operation Manual
for the Model CR5 Program
Controller
”.
Note: Although the calendar has been set at the time of shipping, reset it if the date and the time in
the Guide screen are wrong.
For how to set, refer to the section on FUNCTION 1
“Setting the Calendar Time” in the
separate
“Operation Manual for the Model CR5 Program Controller”.