2. Before operating the unit
Installation procedures/precautions
(1)
Transporting the product
・
Two or more people are required for lifting and transporting the IL702 unit.
※
Take care for protrusions on the unit when transporting it.
(2)
Installing the drain system
・
Drain water generated from defrosting is stored in the drain pan at the left lower side on the
main unit to allow natural evaporation.
・
The drain pan may not accept all water generated from defrosting, if too much frost has
generated during operation without defrosting. When frost to remove seems to be too
much, prepare a separate larger pan.
・
Be sure to stop the unit before attaching or removing the drain pan.
・
Be sure to empty the drain pan before moving the unit.
(3)
Attaching the manual holder
・
Attach the manual holder included with the unit
as shown in the picture.
Hook the key hole shaped openings on the
holder onto the knurled screws on the right
side panel of the unit.
Store this operation manual and the manual
for CR5 Program Controller in this holder.
(4)
Install shelf boards.
・
Install shelf pegs at heights you want on the right and left shelf posts in the internal bath of
the main body.
・
Completely push shelf boards by sliding to the end.
*Take care to put each shelf board on correct pairs of right and left shelf pegs.
・
Make sure that shelf boards will not fall nor rattle.
・
Withstand load of each shelf board is 15 kg in even loading. When putting specimens,
arrange them as dispersed as possible.
Shelf board
Specimen
15kg