2 - 48
SPEC
CABLE ROUTING
Ó
Fasten the right headlight lead, differential gear
case breather hose, radiator fan motor lead, and
coolant reservoir breather hose with the plastic
band.
Ô
Fasten the positive battery lead with the plastic
holder.
Õ
4 mm (0.16 in) of clearance or more is required
around the boot.
Ö
59 ~ 61 mm (2.32 ~ 2.40 in)
H
I
J
K
A
A
D
E
F
G
B
C
D
8
9
0
1 2 3 4 5 6
7
L
M
N
O
P
Q
R
S
È É
Ê
Ë
Ì
Í
Î
Ï
Ð
Ñ
Ò
Ó
Ô
Õ
Ö
B
B
A
B-B
A