For Service Engineer
Service Information
SI1705004E-00=SIGMA-G5SII Service Manual
2/273
Table of Contents
Removal of the cover and cutter guide cover in the power breaker section ............... 16
Running-in Operation before Adjustment (Standard: 1 hour) .................................... 22
Differences from SIGMA-G5S and Precautions (Installation Adjustment Related) . 23
Preparation before the Post-Installation Adjustment Operation ............................... 24
Chute Level (Perform the teaching selecting "Teach Start (Shipment)") ................... 30
"Driver Mng." Tab Sheet in the "CONVEYOR" Window................................................. 73