3-10
Tiller handle
c.
Install the tiller handle assembly “3” to the
steering arm “4”, and then tighten the tiller
handle nuts “5” to the specified torque.
d.
Install the cable guide “6” to the bottom
cowling, and then tighten the cable guide
bolt “7” to the specified torque.
e.
Install the main wire harness and battery
cable. See “Installing the main wire har-
ness” (3-8) and “Installing the battery ca-
ble” (3-5).
f.
Remove the cap “1”.
g.
Route the alert indicator harness “2”
through the bottom cowling, and then con-
nect the alert indicator harness coupler “a”.
h.
Remove the cap “1”.
i.
Route the trolling switch harness “2”
through the bottom cowling, and then con-
nect the trolling switch harness coupler “a”.
j.
Install the shift cable and throttle cable.
See steps 2–4 in “Installing the shift cable
and throttle cable” (3-6).
k.
Install the rigging grommet and grommet
holder. See “Installing the rigging grom-
met” (3-9).
l.
Fasten the main wire harness, battery ca-
ble, alert indicator harness, trolling switch
harness, shift cable, and throttle cable us-
ing the plastic tie “1”.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Tiller handle nut “5”
40 N·m (4.0 kgf·m, 30 lb·ft)
Cable guide bolt “7”
10 N·m (1.0 kgf·m, 7.4 lb·ft)
5
5
3
4
7
6
2
1
T
R
.
.
a
2
1
1
a
2
1
Summary of Contents for F30B 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...