7-7
Power unit assembly
Removing the power unit
Cover the fuel components using a rag to pre-
vent fuel from spilling out.
1.
Remove:
• Power unit assembly
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Remove the grommet holder “1”, grommet
“2”, and rigging grommet “3”.
b.
Remove the clips “1”, and then disconnect
the shift cable “2” and the throttle cable “3”.
c.
Remove the plastic tie “1”, and then dis-
connect the 10-pin coupler “a”.
d.
Remove the main wire harness “b” from
the clamp “2” and the plastic tie “3”.
e.
Remove the cover “4”.
f.
Remove the battery cables “1”.
g.
Remove the caps “2”, and then remove the
PTT motor leads “3” from the PTT relay
“4”, clamp “5”, and plastic tie “6” (PTT mod-
el).
h.
Disconnect the shift position switch cou-
pler “a” and the 6Y8 multifunction meter
harness coupler “b”.
i.
Disconnect the trolling switch coupler “c”
and the alert indicator coupler “d” (tiller
handle model).
1
2
3
1
2
3
1
2
3
a
b
4
1
2
3
4
5
6
Summary of Contents for F30B 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...