6S35H11
7-46
9
8
7
6
5
4
3
2
1
Tilt cylinder and trim cylinder
3.
Install the tilt piston assembly into the tilt
cylinder, and then tighten the tilt cylinder
end screw
1
to the specified torque.
NOTE:
Place the tilt cylinder end screw at the bottom
of the tilt ram and install the tilt piston assem-
bly into the tilt cylinder.
Bleeding the PTT unit
1.
Tighten the manual valve
1
by turning it
clockwise.
2.
Place the PTT unit in an upright position.
3.
Remove the reservoir cap, and then
check the fluid level in the reservoir.
NOTE:
The fluid level should be at the brim of the
filler hole.
4.
If fluid is below the correct level, add fluid
of the recommended type.
5.
Install the reservoir cap, and then tighten
it to the specified torque.
6.
Connect the PTT motor leads
2
to the
battery terminals to fully retract the rams.
7.
Reverse the PTT motor leads between
the battery terminals to fully extend the
rams.
NOTE:
9
Repeat this procedure so that the rams go
up and down 4 or 5 times (be sure to wait a
few seconds before switching the leads).
9
If the rams do not move up and down easi-
ly, push and pull on the rams to assist oper-
ation.
6S370480
1
Tilt cylinder end screw
1
:
90 N·m (9.0 kgf·m, 66.4 ft·lb)
Cylinder-end screw wrench:
90890-06568
6S370490
1
Manual valve
1
:
2 N·m (0.2 kgf·m, 1.5 ft·lb)
Reservoir cap:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
6S370500
2
2
Ram
PTT motor lead
Battery
terminal
Up
Sky blue (Sb)
+
Light green (Lg)
-
Down
Light green (Lg)
+
Sky blue (Sb)
-
6S35H11_072 05.9.9 0:42 Page 47
Summary of Contents for 250GETO
Page 1: ...L250G SERVICE MANUAL 6S3 28197 5H 116 250G 250G L250G ...
Page 4: ......
Page 135: ... MEMO 9 8 7 6 5 4 3 2 1 6S35H11 5 48 ...
Page 201: ...6S35H11 6 64 9 8 7 6 5 4 3 2 1 MEMO ...
Page 291: ......
Page 292: ...YAMAHA MOTOR CO LTD Printed in Japan Aug 2005 1 4 1 E_2 Printed on recycled paper 250G L250G ...