60H5E11
Electrical systems
ELEC
Checking the fuse
1. Check the fuse for continuity. Replace if
there is no continuity.
60h80210
Checking the wiring harness (10 pins)
1. Check the wiring harness for continuity.
Replace if there is no continuity.
Checking the starter relay
1. Connect the digital circuit tester leads to
the starter relay terminals.
2. Connect the brown (Br) lead
A
to the posi-
tive battery terminal.
3. Connect the black (B) lead
B
to the nega-
tive battery terminal.
4. Check continuity between the starter relay
terminals. Replace if there is no continuity.
60h80220
5. Check that there is no continuity between
the starter relay terminals after disconnect-
ing the brown(Br)
A
or black(B) lead
B
.
Replace if there is continuity.
8-15