45
5.
Attach one end of the power cord to the power receptacle and the other end to a
properly grounded 90-250 VAC, 50-60 Hz or 24 VDC (on DC units) outlet, which-
ever applies. (See
Hazardous Location Installations
later in this chapter for more in-
formation.)
6.
Implement the proper grounding techniques. Establish a ground path from the unit
chassis to the enclosure chassis. A 6-32 threaded ground point hole is provided on
the bottom panel of the unit.
7.
Tighten the eight #8-32 nuts on 3408 units to 16 inch-pounds (1.8 Newton-meters;
18 Kgf cm). Tighten the twelve #10-32 nuts on 3410 units to 25 inch-pounds (2.8
Newton-meters; 28 Kgf cm).
8.
Turn on power to the unit. The system will boot up to the operating system installed.
Install application software via a floppy drive, the IR port, or a network.