Explanation of control elements
Putting into operation
30
BA61101/08.00/Pla/MLP5-E2
BA61101/08.00/Pla/MLP5-E2
31
Minimum cuvette filling
Cuvette
Min.
Filling capacity
[ml]
Min.
Filling height
[mm]
l
14 mm vial
2.6 ml
20 mm
¨
10 mm rectangular cuvette
2.0 ml
20 mm
¨
20 mm rectangular cuvette
4.0 ml
20 mm
¨
50 mm rectangular cuvette
10 ml
20 mm
Placing of cuvettes in the cuvette compartment
Place cuvettes into cuvette compartment acc. to
indications on the MultiLab P5.
In case of wrong placing of the cuvette incorrect
measurements may occur.
Place cuvettes in the compartment down to stop .
The error message:
indicates a wrong insertion.
Insert cuvette again and take care of right and
correct position.
Mains power supply
The line voltage and the working voltage indicated
on the line adapter must correspond!
Connect line adaptor to the power
supply socket of the MultiLab P5.
Plug line adaptor in the mains socket.
Switch on the MultiLab P5.
Only the pH electrode and the conductivity cell may be
immersed into the same solution!
For first measurement after putting into operation the result of
the test value is displayed some seconds later than during
normal operation.
Summary of Contents for MultiLab P5
Page 2: ......
Page 12: ......
Page 56: ......
Page 96: ......
Page 201: ...Configuration BA61101 08 00 IWA MLP5 E2 201 meas A 360nm Aref new filter description...
Page 242: ...Technical data 242 BA61101 08 00 IPro MLP5 E3 Test certificate EMC...
Page 244: ......