Sawmill Setup
Portable Sawmill Setup
3
3-4
30S97doc041910
Sawmill Setup
1.
Unhitch the mill from the vehicle.
2.
Lower and set the front three outriggers. To lower, use the provided jack handle to lift the
weight from the locking pin. If necessary, rotate the locking pin counterclockwise so that
the inner roll pin is free from the outrigger channel notch, then pull the locking pin out to
release the outrigger. Lower the outrigger as necessary. Push the locking pin back in and
turn clockwise until the inner roll pin is behind the outrigger channel notch to “lock” the
outrigger in place.
WARNING!
Put front outrigger down before moving cutting
head from the rest position. Failure to do so may result in
serious injury.
NOTE:
Mills prior to LT30 Super H2.02 and LT40 Super H3.02 do not have a notch in the
outrigger channel.