12
2.
For the Installer
2.4.4 Prior to installation
Move the boiler to its definitive installation position and use the set screws to align it inclined slightly upwards
towards the rear. If it is not possible to level the unit using only the rear set screws, two additional set screws
can be installed at the front – Fig. 8.
The cladding door and the boiler doors are designed for door catches on either the left or right. Standard delivery
always includes door catches on the left. The catches on the cladding door and boiler doors must be on the same
side.
Prior to installing the set screws, the lower door hinge and the dog point screw for attaching the cladding door
must be mounted either on the left or right, depending on which side the door catches are to be located. – Fig. 7.
Fig. 7
Install door hinge for cladding door
left or right
2 x
1 x
Fig. 8
Install two set screws in the front
2.4.5 Installing the flue connection adapter
– Only for LogWIN with flue connection adapter (accessories)
Standard installation of the blower housing is directly on the boiler – Fig. 9
è
flue connection at top.
With the adapter (accessories), the blower housing is located outside the cladding – Fig. 12. The flue connec-
tion is steplessly adjustable from left to right – Fig. 11.
– Unscrew 4 interior nuts in the blower housing (Fig. 9) and remove the housing. Do not remove the seal – Fig. 10.
Fig. 9
Glower housing directly on boiler –
standard
Fig. 10 Seal on boiler