
11
2.
For the Installer
1 ........... Lower door hinge
2 ........... Carburisation gas duct
3 ........... Side panel left
4 ........... Side panel right
5 ........... Rear wall top
6 ........... Rear wall bottom
7 ........... Front boiler cover
8 ........... Rear boiler cover
9 ........... Hook-in plate ash pan
10 ......... Bottom insulation, left/right
11 ......... Top insulation, left/right
12 ......... Top rear insulation
13 ......... Bottom rear insulation
14 ......... Top front insulation
15 ......... Cladding door
16 ......... Magnet retainer (2 pcs.)
17 ......... Grommet
18 ......... Lever for cleaning heating surfaces
19 ......... Carburisation gas duct attachment (2 pcs.)
20 ......... Control panel
21 ......... Upper door hinge
22 ......... Control panel
23 ......... Dog point screw (2 pcs.)
24 ......... Cable channel (2 pcs.)
25 ......... Lambda sensor
26 ......... Air control
27 ......... Set screws front (2 pcs.)
28 ......... Magnetic catch (2 pcs.)
29 ......... Blower seal
30 ......... Flue connection adapter – accessories
31 ......... Blower housing
32 ......... Flue gas blower
33 ......... Wing nugs
34 ......... Lighting door with automatic ignition – accessory
35 ......... Hanger – accessory
only LogWIN pellet ready:
36 ......... Top insulation left
37 ......... Top insulation
38 ......... Side panel left
39 ......... Shaft for cleaning heating surfaces
40 ......... Shorter lever
41 ......... Lever for cleaning heating surfaces
2.3.2 Taking into the building and installing
The appliance must be taken into the building and installed without subjecting it to significant knocks and jolts,
in order to avoid damaging the combustion chamber and/or the parts slipping. The warranty will be invalidated if
the appliance is damaged due to having been taken into the building and installed incorrectly or if the appliance
malfunctions as a consequence of this.
The LogWIN may only be transported upright and without cladding and it is easiest to transport using a lift truck
or by rolling on pipes. When transporting via stairs and the such like, the boiler must be suitably secured. Also
refer to the technical data in section 4.5 for transport dimensions.
Note!
There is a crane lug on the top of the boiler for transport using hoisting winches. The weight can
be reduced by approx. 120 kg by removing parts which are easy to disassemble (e.g. doors, hook-in
plates, burnthrough plates, heating surface cleaning etc.).
The boiler can be installed directly on a non-flammable surface and does not require special foundations.
2.3.3 Minimum clearances for fire protection, cleaning and
maintenance
The following minimum clearances from flammable materials and for connections, cleaning and maintenance must
be complied with.
Attention!
Follow the installation guidelines for boiler rooms! The configuration of the exhaust line must com-
ply with technical fire protection requirements in accordance with the applicable regulations, stan-
dards and guidelines.
Minimum clearances between exhaust pipe (piece connecting to flue) and combustible components
400
1
mm
for an uninsulated exhaust pipe
100
1
mm
for an insulated exhaust pipe (min. 2 cm insulation thickness)
50
2
mm
for tested, double-walled exhaust system
1
DIN V 18 160-1
2
in accordance with approval/identification of exhaust system