Installation Manual: Whipple SC 21_F150_R5
Last Updated: June 12
th
, 2021
Page 18 of 39
www.whipplesuperchargers.com
43.
Install the supplied TMAP pigtail to the 3-Bar TMAP supplied, wrap up to SC inlet as this will get connected to stock
harness later.
Brown
Green
4
3
2
1
Yellow
Purple
4
3
2
1
MAP
VREF
IAT
Signal RTN
Signal RTN
MAP
VREF
IAT
Male plugs into
FACTORY HARNESS SIDE
MAP Connector to plug
into sensor shown
44.
Install the supplied (8) manifold orings into the Whipple intake manifold.
45.
Make sure the supercharger is on a flat surface. Remove the oil fill plug using an 8mm allen socket.
•
Fill the compressor to the BOTTOM of the fill plug (4.0 FL/OZ). Rock compressor back and forth. Then spin
the compressor/rotors by the pulley so the oil fills the bearings.
NEVER OVER FILL THE SUPERCHARGER!
•
Apply light amount of grease to oil fill plug oring, reinstall. Torque to 140 lbs-in.
OPERATING LEVEL
BELOW LEVEL
46.
Remove the tape you previously installed on the exposed ports on cylinder head. Clean surface with carb cleaner or
acetone.