Installation Manual: Whipple SC 21_F150_R5
Last Updated: June 12
th
, 2021
Page 17 of 39
www.whipplesuperchargers.com
40.
Using the supplied 5/16” OD silicone tube, install the (1) 80 1/2” cord. Start as shown with green arrow, go in a
clockwise motion, to the front, then around the perimeter. End at yellow arrow position. Bunch it up so it has no gap
at the end as any gap will be an air leak of un-intercooled air. Install the (1) 6.5” cord in the front section shown
with the blue arrow.
41.
Install the supplied pre-formed 65.3” x .103” oring to the top sealing surface of the SC housing. Apply generous
amount of grease to help ease the oring into place. TIP: To install oring into dove-tail groove, press vertically, vs
sliding finger along.
42.
Install the supplied 3-bar TMAP sensor to the front of the intake manifold using the supplied (1) 6mm x 20mm SHCS
with the (1) 6mm AN washer with light amount of
Blue Loctite #243
to the threads. Apply generous amount of
grease to the rubber oring for easy installation. Torque to 65 in-lb.