Installation Manual: Whipple SC 21_F150_R5
Last Updated: June 12
th
, 2021
Page 21 of 39
www.whipplesuperchargers.com
54.
Reinstall the water pump pulley using a 10mm socket, torque to 14 lbs-ft.
55.
Install the (1) #2-230 internal bypass oring to the lid bypass passage. Use generous amount of grease to secure
oring in place and help with lid installation.
56.
Apply generous amount of grease to the (1) #2-230 Viton bypass oring. Install the supercharger lid to the
supercharger housing by carefully placing the bypass down. Secure the SC lid using the (17) 6mm x 30mm HHFCS
and (3) 6mm x 70mm HHFCS (
marked green
) using the following pattern. Slide the EECPV bracket under bolts 3
and 5 from image (bank 2). Torque to 90 lbs-in using an 8mm socket.
10
8
2
4
6
11
12
7
1
3
5
9
16
19
15
14
18 20 17
13