Installation Manual: Whipple SC 21_F150_R5
Last Updated: June 12
th
, 2021
Page 23 of 39
www.whipplesuperchargers.com
60.
Install the supplied 3/8” ID x 13” with 55deg quick connect fitting hose to the EECPV barb fitting and upper quick
connect fitting on SC inlet. Push until it clicks and locks into place.
61.
Install the stock PCV hose to the RH side valve cover. Connect other end to the supercharger inlet 15.82mm quick
connect fitting. *Note: This requires you to rotate the fittings for proper fitment. Push until it clicks and locks into
place.
62.
Connect the coolant vent line to new barb fitting at water neck. Install stock clamp. Failure to do this will result in
possible leak.