30998 R1
33
Install the Hopper Cloth Frame
1. Slide the upper side frames (1) into the hopper cloth (2) (see
Figure 21
).
Note
Apply grease to frame pieces if required.
Note
Steps 2–4 will be performed later in the hopper cloth installation.
2. Slide the two lower side frames (4) into the hopper cloth.
3. Slide the lower front frame (6) into the hopper cloth.
4. Slide the two lower back frames (3) into the hopper cloth.
Table 12.
Hopper Cloth Frame Components
Item
Description
1
Upper side frame
2
Hopper cloth
3
Lower back frame
4
Lower side frame (long)
6
Lower front frame
Figure 21.
Installing the Hopper Cloth Frame
Install the Flashing
1. Lay the front flashing (1) on the hopper while ensuring it is flush with the edge of the main hopper frame
(see
Figure 22
).
2
4
3
1
6
4
2
4
3
1
6
4
WCX 1335 TOP-DRIVE CONVEYOR – PORTABLE GRAIN BELT CONVEYOR
4. ASSEMBLY