On flat ground, a center pivot is subjected to certain stresses in certain proportions, all of which it is
designed to easily handle . However, when the machine is subjected to various slope conditions, stresses
and their proportions to each other change dramatically .
In a longitudinal slope situation as shown in Figure 1-6 .a ., the spans are placed in either tension on a
descending slope (as shown) or compression on an ascending slope . Exceeding the slope limitations set
forth could create excessive tension and compressive forces in both spans, and especially the pivot point .
Figure 3. Longitudinal Slope
Rise a
Rise b
Run a
Run b
% Slope =
+
Figure 3-4a. - Dips and Ravines
In a longitudinal slope situation as shown in Figure 1-6 .a ., the spans are placed in either tension on a
descending slope (as shown) or compression on an ascending slope . Exceeding the slope limitations set
forth could create excessive tension and compressive forces in both spans, and especially the pivot point .
Figure 3-4b.- High Centering Danger
85
85
85
Section 3-3
Getting Started
Slope Considerations
Summary of Contents for CP600
Page 1: ...CP600 Pivot Operation Manual POM EN December 2018 ...
Page 2: ...2 This Page Intentionally Left Blank ...
Page 5: ...5 POM EN December 2018 CP600 Pivot Operation Manual Section 1 Operation Safety Maintenance ...
Page 6: ...6 This Page Intentionally Left Blank ...
Page 41: ...CP600 Pivot Operation Manual POM EN December 2018 41 Section 2 General Information ...
Page 83: ...CP600 Pivot Operation Manual POM EN December 2018 83 Section 3 Getting Started ...
Page 89: ...89 This Page Intentionally Left Blank ...
Page 98: ...98 This Page Intentionally Left Blank ...
Page 99: ...CP600 Pivot Operation Manual POM EN December 2018 99 Section 4 Panel Operation ...
Page 112: ...112 This Page Intentionally Left Blank ...
Page 113: ...CP600 Pivot Operation Manual POM EN December 2018 113 Section 5 Electrical ...
Page 119: ...119 This Page Intentionally Left Blank ...
Page 123: ...123 This Page Intentionally Left Blank ...
Page 128: ...CP600 Pivot Operation Manual POM EN December 2018 128 Section 5 16 Electrical Notes ...
Page 129: ...CP600 Pivot Operation Manual POM EN December 2018 129 Section 5 17 Electrical Notes ...
Page 130: ...CP600 Pivot Operation Manual POM EN December 2018 130 Section 5 18 Electrical Notes ...
Page 131: ...CP600 Pivot Operation Manual POM EN December 2018 131 Section 5 19 Electrical Notes ...
Page 132: ...132 This Page Intentionally Left Blank ...
Page 133: ...133 Section Title This Page Intentionally Left Blank ...
Page 134: ...134 POM EN December 2018 www western irrigation com ...