CP600 Pivot Operation Manual
POM-EN-Dec
ember 20
18
8
Winterization see manufacturers specifications Section 9-24.
CAUTION: Hard hat and steel toe work boots recommended when assembling equip-
ment
CAUTION: Be aware of pinch points when assembling equipment.
CAUTION: Could cause minor injury and or damage to machinery equipment, compo-
nents, product, etc.,
Note: Manufacture’s general comment, recommendation or instruction.
Lock Out / Tag Out Manufacturer recommends locking the main power disconnect
before servicing or troubleshooting electrical components. See
CAUTION or WARNING Disconnect electrical power prior to servicing or troubleshoot-
ing components.
WARNING: DO NOT ATTEMPT TO ASSEMBLE OR TROUBLESHOOT MACHIN-
ERY IF THERE IS POTENTIAL FOR A LIGHTENING STORM. COMPONENTS ARE
HIGHLY CONDUCTIVE AND SERIOUS INJURY OR POSSIBLE DEATH MAY OC-
CUR IF STRUCK BY LIGHTENING.
DANGER: DO NOT IRRIGATE NEXT TO POWER LINES. SPRAYING WATER ON
POWER LINES COULD CAUSE SERIOUS INJURY OR DEATH.
Section 1-4
Operation, Safety & Maintenance
Safety Symbols, Pictures and Definitions
Summary of Contents for CP600
Page 1: ...CP600 Pivot Operation Manual POM EN December 2018 ...
Page 2: ...2 This Page Intentionally Left Blank ...
Page 5: ...5 POM EN December 2018 CP600 Pivot Operation Manual Section 1 Operation Safety Maintenance ...
Page 6: ...6 This Page Intentionally Left Blank ...
Page 41: ...CP600 Pivot Operation Manual POM EN December 2018 41 Section 2 General Information ...
Page 83: ...CP600 Pivot Operation Manual POM EN December 2018 83 Section 3 Getting Started ...
Page 89: ...89 This Page Intentionally Left Blank ...
Page 98: ...98 This Page Intentionally Left Blank ...
Page 99: ...CP600 Pivot Operation Manual POM EN December 2018 99 Section 4 Panel Operation ...
Page 112: ...112 This Page Intentionally Left Blank ...
Page 113: ...CP600 Pivot Operation Manual POM EN December 2018 113 Section 5 Electrical ...
Page 119: ...119 This Page Intentionally Left Blank ...
Page 123: ...123 This Page Intentionally Left Blank ...
Page 128: ...CP600 Pivot Operation Manual POM EN December 2018 128 Section 5 16 Electrical Notes ...
Page 129: ...CP600 Pivot Operation Manual POM EN December 2018 129 Section 5 17 Electrical Notes ...
Page 130: ...CP600 Pivot Operation Manual POM EN December 2018 130 Section 5 18 Electrical Notes ...
Page 131: ...CP600 Pivot Operation Manual POM EN December 2018 131 Section 5 19 Electrical Notes ...
Page 132: ...132 This Page Intentionally Left Blank ...
Page 133: ...133 Section Title This Page Intentionally Left Blank ...
Page 134: ...134 POM EN December 2018 www western irrigation com ...