Your Western pivot requires 480 volt 60 cycle, 3-phase electric power to operate sufficient
charge. There is also 110-volt control power throughout the system. Other potential haz-
ards include any injected fertilizers and pesticides, and water under pressure.
Note: Voltage is dependant upon location. Voltage should not be more than +/- 5% than
the recommended voltage in your area.
CAUTION: Return operating controls to “neutral” or “off” position after mainte-
nance is completed.
Sequence of Lockout or Tagout Procedure
1. Notify all affected persons that you are about to lockout the pivot, and tell them why the piv
ot is being placed “out of service”. Before locking out the pivot, you must familiarize yourself
with the type and magnitude of the pivot’s energy source and determine any related haz
ards.
2. If the machine or system is operating shut it down by rotating the forward / reverse selector
switch to the off position.
3. On the main control panel, turn the main disconnect lever to the off position so the pivot
cannot be energized while it is being serviced. Drain all water from the system and disen
gage any automatic valves. If your pivot is rigged with an automatic valve, it must be locked
out so that the pivot does not unexpectedly fill with water while you are servicing.
4. Lockout the main disconnect (energy-isolating device) on the main control panel. If working
down line on the pivot, the tower disconnect switches on the individual tower boxes must
also be shut off.
5. After ensuring that no personnel are exposed, and as a check on having disconnected the
energy source, operate the start button to make certain the pivot will not operate.
Section 1-20
Operation, Safety & Maintenance
Lockout/Tagout Procedures
Summary of Contents for CP600
Page 1: ...CP600 Pivot Operation Manual POM EN December 2018 ...
Page 2: ...2 This Page Intentionally Left Blank ...
Page 5: ...5 POM EN December 2018 CP600 Pivot Operation Manual Section 1 Operation Safety Maintenance ...
Page 6: ...6 This Page Intentionally Left Blank ...
Page 41: ...CP600 Pivot Operation Manual POM EN December 2018 41 Section 2 General Information ...
Page 83: ...CP600 Pivot Operation Manual POM EN December 2018 83 Section 3 Getting Started ...
Page 89: ...89 This Page Intentionally Left Blank ...
Page 98: ...98 This Page Intentionally Left Blank ...
Page 99: ...CP600 Pivot Operation Manual POM EN December 2018 99 Section 4 Panel Operation ...
Page 112: ...112 This Page Intentionally Left Blank ...
Page 113: ...CP600 Pivot Operation Manual POM EN December 2018 113 Section 5 Electrical ...
Page 119: ...119 This Page Intentionally Left Blank ...
Page 123: ...123 This Page Intentionally Left Blank ...
Page 128: ...CP600 Pivot Operation Manual POM EN December 2018 128 Section 5 16 Electrical Notes ...
Page 129: ...CP600 Pivot Operation Manual POM EN December 2018 129 Section 5 17 Electrical Notes ...
Page 130: ...CP600 Pivot Operation Manual POM EN December 2018 130 Section 5 18 Electrical Notes ...
Page 131: ...CP600 Pivot Operation Manual POM EN December 2018 131 Section 5 19 Electrical Notes ...
Page 132: ...132 This Page Intentionally Left Blank ...
Page 133: ...133 Section Title This Page Intentionally Left Blank ...
Page 134: ...134 POM EN December 2018 www western irrigation com ...