CP600 Pivot Operation Manual
POM-EN-Dec
ember 20
18
14
•
PIVOT:
At start of irrigation season, grease pivot bearings. Repeat every 400 hours of
operation.
•
GEARBOXES:
At start of irrigation season, drain all gearboxes and refill with
recommended oil. See Power Drivetrain Maintenance section for detailed information.
•
MOTOR GEARBOXES:
At start of irrigation season drain any water that may have
accumulated during the irrigation season and fill to the proper level with the proper lubricant.
•
TIRES:
Check tire inflation (use low pressure tire gauge). Western Corporation inflates all
new tires to a higher pressure for truck loading requirements. Set tire pressure so side wall
has slight flex. If tire creases increase pressure. If tire pressure too low tires will lose bead and
damage the tube.
CAUTION: Operating tires below the manufacturers recommended pressure can
result in damage to the tire sidewall in addition to voiding your warranty.
•
WHEEL BOLTS:
Check
to ensure they are tight.
Note: Wheel bolts can loosen after initial installation. They should be checked after 100
hours of operation.
•
STRUCTURE:
Routinely check pivot, span and tower structures for loose or missing bolts.
•
CONNECTORS:
Check for leaking gaskets, boots, drains, and malfunctioning sprinklers or
pressure regulators.
Section 1-10
Operation, Safety & Maintenance
Maintenance Check List
Summary of Contents for CP600
Page 1: ...CP600 Pivot Operation Manual POM EN December 2018 ...
Page 2: ...2 This Page Intentionally Left Blank ...
Page 5: ...5 POM EN December 2018 CP600 Pivot Operation Manual Section 1 Operation Safety Maintenance ...
Page 6: ...6 This Page Intentionally Left Blank ...
Page 41: ...CP600 Pivot Operation Manual POM EN December 2018 41 Section 2 General Information ...
Page 83: ...CP600 Pivot Operation Manual POM EN December 2018 83 Section 3 Getting Started ...
Page 89: ...89 This Page Intentionally Left Blank ...
Page 98: ...98 This Page Intentionally Left Blank ...
Page 99: ...CP600 Pivot Operation Manual POM EN December 2018 99 Section 4 Panel Operation ...
Page 112: ...112 This Page Intentionally Left Blank ...
Page 113: ...CP600 Pivot Operation Manual POM EN December 2018 113 Section 5 Electrical ...
Page 119: ...119 This Page Intentionally Left Blank ...
Page 123: ...123 This Page Intentionally Left Blank ...
Page 128: ...CP600 Pivot Operation Manual POM EN December 2018 128 Section 5 16 Electrical Notes ...
Page 129: ...CP600 Pivot Operation Manual POM EN December 2018 129 Section 5 17 Electrical Notes ...
Page 130: ...CP600 Pivot Operation Manual POM EN December 2018 130 Section 5 18 Electrical Notes ...
Page 131: ...CP600 Pivot Operation Manual POM EN December 2018 131 Section 5 19 Electrical Notes ...
Page 132: ...132 This Page Intentionally Left Blank ...
Page 133: ...133 Section Title This Page Intentionally Left Blank ...
Page 134: ...134 POM EN December 2018 www western irrigation com ...