CP600 Pivot Operation Manual
POM-EN-Dec
ember 20
18
20
B. Helical gear center drive lubricants Reference Figure 1-15. :
Use only SAE 30W, SAE 40W, SAE 50W, or SAE 20W-50 multi viscosity engine oil. Use of im-
proper oil will void the gearbox warranty. Oil capacity is approximately one (1) U.S. gallon (3.8 Li-
ters).
C. In-season spur gear center drive maintenance.
Helical gear center drive gearboxes should be inspected periodically during the operating season
as follows:
1. The proper oil level (1-1/2” [45 mm] from top of gear case) should be maintained at all
times.
2. Contaminated or emulsified oil should be replaced with fresh oil.
3. Input & output shaft seals should be inspected for excessive leaks and replaced if neces
sary.
4. Motor drain holes must be kept clear to allow moisture to drain.
5. Expansion chamber vent holes.
Figure 1-16.
Section 1-16
Operation, Safety & Maintenance
Power Drivetrain Maintenance
Summary of Contents for CP600
Page 1: ...CP600 Pivot Operation Manual POM EN December 2018 ...
Page 2: ...2 This Page Intentionally Left Blank ...
Page 5: ...5 POM EN December 2018 CP600 Pivot Operation Manual Section 1 Operation Safety Maintenance ...
Page 6: ...6 This Page Intentionally Left Blank ...
Page 41: ...CP600 Pivot Operation Manual POM EN December 2018 41 Section 2 General Information ...
Page 83: ...CP600 Pivot Operation Manual POM EN December 2018 83 Section 3 Getting Started ...
Page 89: ...89 This Page Intentionally Left Blank ...
Page 98: ...98 This Page Intentionally Left Blank ...
Page 99: ...CP600 Pivot Operation Manual POM EN December 2018 99 Section 4 Panel Operation ...
Page 112: ...112 This Page Intentionally Left Blank ...
Page 113: ...CP600 Pivot Operation Manual POM EN December 2018 113 Section 5 Electrical ...
Page 119: ...119 This Page Intentionally Left Blank ...
Page 123: ...123 This Page Intentionally Left Blank ...
Page 128: ...CP600 Pivot Operation Manual POM EN December 2018 128 Section 5 16 Electrical Notes ...
Page 129: ...CP600 Pivot Operation Manual POM EN December 2018 129 Section 5 17 Electrical Notes ...
Page 130: ...CP600 Pivot Operation Manual POM EN December 2018 130 Section 5 18 Electrical Notes ...
Page 131: ...CP600 Pivot Operation Manual POM EN December 2018 131 Section 5 19 Electrical Notes ...
Page 132: ...132 This Page Intentionally Left Blank ...
Page 133: ...133 Section Title This Page Intentionally Left Blank ...
Page 134: ...134 POM EN December 2018 www western irrigation com ...