SS590
Page II-17
WESMAR
5.0
POWER TO THE
LEAD SCREW HOIST
Connect power to the Junction Box.
The power source for the hoist system need
not be the same as the power source for the
console.
Route the hoist power cable through one of the
small strain reliefs in the bottom of the
Junction Box.
For DC hoist, attach positive [+] lead to
Terminal 30, and negative [-] to Terminal
31.
Be sure of correct polarity.
6.0 SOUNDOME WIRING
Route the soundome cable through one of the
large strain reliefs in the bottom of the
Junction Box.
Connect the numbered lugs of the soundome to
the same numbered terminals on the Hoist Board
in the Junction Box.
Place the urethane strain relief on top of the
soundome.
7.0
LEAD SCREW HOIST
OPERATION CHECK
The hoist motor is calibrated at the factory
for correct travel distance, but you should
check it after installation. Incorrect travel
distance means your soundome may not be
going low enough into the water to allow
the soundbeam full clearance.
Summary of Contents for SS590 SERIES
Page 3: ...INSTALLATION AND OPERATION WESMAR Page I 2 ...
Page 4: ......
Page 5: ...INSTALLATION AND OPERATION WESMAR I 3 Page Section I INTRODUCTION ...
Page 8: ...SS590 Page I 6 WESMAR ...
Page 9: ...Page II 1 WESMAR SS590 Section II INSTALLATION ...
Page 16: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Page 17: ...SS590 Page II 9 WESMAR ...
Page 18: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Page 19: ...SS590 Page II 9 WESMAR ...
Page 22: ......
Page 38: ...SS590 WESMAR Page II 28 ...
Page 51: ...SS590 Page IV 1 WESMAR Section IV FIELD ADJUSTMENTS ...
Page 56: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 6 THIS PAGE LEFT BLANK ...
Page 58: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 8 ...
Page 61: ...SS390E WESMAR Page IV 11 CIRCUITBOARD 5 voe MONITOR 021 RECEIVER A DJ ...