SS590
WESMAR
Page II - 11
4.0 SEACHEST FLANGE
For metal seachests, the seachest flange must
be made of the same material as the seachest
and welded to the seachest pipe.
See Pages 2-8 through 2-10 for flange
dimensions. A flange is included with
WESMAR's optional fiberglass seachest,
5.0 INSTALLATION POSITION
The seachest must be perpendicular to the
water line.
Attach the seachest to the hull with
standard shipyard procedures. Support
the seachest with gussets or stringers to
minimize vibration.
The bottom of the seachest must be 1cm (.5
inches) above the bottom of the keel.
6.0 FAIRING
This section only applies to seachests that ex-
tend outside the hull.
Build a 1 meter long fairing around the
seachest to reduce turbulence and air
bubbles at high speeds.
Turbulence and air bubbles reduce sonar
performance.
For seachest installations next to the keel,
run fairing from the seachest to the keel in
front and behind.
For installations away from the keel, place
fairing completely around the seachest.
1CM (.5 IN.)
SEACHEST EXTENSION BELOW HULL
Summary of Contents for SS590 SERIES
Page 3: ...INSTALLATION AND OPERATION WESMAR Page I 2 ...
Page 4: ......
Page 5: ...INSTALLATION AND OPERATION WESMAR I 3 Page Section I INTRODUCTION ...
Page 8: ...SS590 Page I 6 WESMAR ...
Page 9: ...Page II 1 WESMAR SS590 Section II INSTALLATION ...
Page 16: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Page 17: ...SS590 Page II 9 WESMAR ...
Page 18: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Page 19: ...SS590 Page II 9 WESMAR ...
Page 22: ......
Page 38: ...SS590 WESMAR Page II 28 ...
Page 51: ...SS590 Page IV 1 WESMAR Section IV FIELD ADJUSTMENTS ...
Page 56: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 6 THIS PAGE LEFT BLANK ...
Page 58: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 8 ...
Page 61: ...SS390E WESMAR Page IV 11 CIRCUITBOARD 5 voe MONITOR 021 RECEIVER A DJ ...