48
Disassembly and reassembly
Welch Allyn Propaq LT Vital Signs Monitor
Removing the lower housing, I/O panel, and power board
1.
Remove the seven machine screws from the bottom of the lower housing.
REASSEMBLY:Note the three screw holes that have nylon washers. These washers must
be used in these screw holes.
2.
Remove the threadlocking screw and nylon washer from the bottom of the I/O panel.
Bottom chassis screws (7)
Reassembly: 6 inch lbs
Nylon washers
I/O panel screw
Reassembly: 2 inch lbs
USB-equipped models only:
bend this rubber plug out to
remove the bottom chassis.
(detail)
Summary of Contents for Propaq LT 802LT0N
Page 1: ...Propaq LT Vital Signs Monitor Service Manual Software version 1 5X or later ...
Page 4: ...iv Contents Welch Allyn Propaq LT Vital Signs Monitor ...
Page 8: ...4 Safety summary Welch Allyn Propaq LT Vital Signs Monitor ...
Page 28: ...24 Troubleshooting and repair Welch Allyn Propaq LT Vital Signs Monitor ...
Page 74: ...70 Functional verification Welch Allyn Propaq LT Vital Signs Monitor ...
Page 78: ...74 35 ml test volume Welch Allyn Propaq LT Vital Signs Monitor ...