WeCo 5K3-LV-HV
HeSU 5K3-LV HV
Page 31 of 69
V_1.1_21-Nov-2020_LV-HV
2.7
Overview of Multi Cluster System
-Double BUS BAR-
40 Nm
Parallel Screw Terminal must be checked every 3 months
2 x 50mm²
NEGATIVE
2 x 50mm²
POSITIVE
COPPER BUS BAR 360A
PARALLEL
CONNECTION
MASTER
CAN BMS