WeCo 5K3-LV-HV
HeSU 5K3-LV HV
Page 57 of 69
V_1.1_21-Nov-2020_LV-HV
3.5.3 HV BOX AND MODULES POWER CONNECTION
Step 1:
Keep the power box main breaker OFF
Step 2:
connect the positive terminal of the HV BOX to the Positive terminal of the 1
st
battery module
Step 3:
Proceed with the serial connection between all the modules
Step 4:
Connect the negative output from the last module to the negative input of the HV box.
Step 5:
Turn on the HV BOX breaker and wait for the start-up automatic procedure
Step 6: The HV BOX will end the startup procedure within 60 seconds by closing the input circuit
The Orange LED and the Green light will turn on by confirming the working status of the HB BOX
Step 6:
Each module will turn on automatically and the side button will blink for 3 seconds then a fixed green light will
confirm the run status of each module
If one or more modules will not turn on automatically means that the LINK/CAN connection between modules or the
DIP address of one or more modules is not properly set up
Information:
Arrange the cables according to the particular installation requirements, always paying
attention to minimize the length of the cables to avoid voltage drops.
Note: if the system is composed by more than 6 modules it is required to arrange the as per the image,
different arrangements ae strictly prohibited
GREEN LED RUN
RED LED –POWER-