2. Once the wall bracket support has been removed, start stacking the second module on top of
the first module laid on the ground by using the front retractable handles.
ATTENTION
Before stacking the batteries the installer must check the maximum permissible floor load. WeCo recommends that the
installer obtains approval from a civil engineer.
For vertical ground mounted the support surface of the battery is distributed on 4 feet 10x4 cm, make sure to install a
distribution plate or make a proper foundation to support the weight.
In case of horizontal installation, the installer must prepare an adequate distribution plate on the floor in order to make a
safe and stable support for the pile of batteries.
Make sure the support and/or the floor surface is adequate to support the battery load.