WeCo 5K3-LV-HV
HeSU 5K3-LV HV
Page 55 of 69
V_1.1_21-Nov-2020_LV-HV
3.5.2 DATA Connections (Example of 12-Modules)
Step1
: Set up the DIP Switches as per the below picture
Step 2
: Connect the CAN and Link ports starting from the HV BOX port CAN A and LINK then chain connection as shown
below
The HV BOX must be set up before turning it on, the DIP addresses must follow the picture below to enable the CAN communication
The last module of the series must be terminate by addressing the module as shown in the picture to ends the CAN line
HV BOX
BATTERY MODULE
END OF SERIES