background image

WeCo 5K3-LV-HV

HeSU 5K3-LV HV

Page 21 of 69

V_1.1_21-Nov-2020_LV-HV

2.3.1 Stand Alone Battery

The DIP switch must be set as follows to allow a single battery module to communicate with an inverter using CAN communications:

MASTER (INDIVIDUAL)

CAUTION

:

After setting the DIP switch the battery must be restarted for the DIP switch changes to take effect

2.3.2 Parallel Connection ( Slave #1)

MASTER

SLAVE #1

CAUTION

:

After setting the DIP switches the batteries must be restarted for the DIP switch changes to take effect.

2.3.3 Parallel Connection ( Slave #1 + Slave #2)

MASTER

SLAVE #1

SLAVE #2

CAUTION

:

After setting the DIP switches the batteries must be restarted for the DIP switch changes to take effect.

2.3.4 Parallel Connection ( Slave #1 + Slave #2 + Slave #3)

MASTER

SLAVE #1

SLAVE #2

SLAVE #3

CAUTION

:

After setting the DIP switches the batteries must be restarted for the DIP switch changes to take effect

2.3.5 Parallel Connection ( Slave #1 + Slave #2 + Slave #3 + Slave #4)

MASTER

SLAVE #1

SLAVE #2

SLAVE #3

SLAVE #4

Summary of Contents for HeSU 5K3-LV HV

Page 1: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 1 of 69 V_1 1_21 Nov 2020_LV HV Energy Storage System UNIVERSAL 5K3 LOW VOLTAGE HIGH VOLTAGE ...

Page 2: ... of heat ATTENTION The battery terminals must be disconnected before commencing any work on the battery ATTENTION This battery can accumulate parasite current Do not touch the B and B terminals Always check the B and B terminals with a voltmeter Always ensure that there is ZERO volts present on the terminals before performing any operation on the battery ATTENTION Always wear Individual protection...

Page 3: ...al Protective Equipment 18 2 2 Low Voltage Module Wiring and Set Up 19 2 2 1 Battery Connections 19 2 2 2 Battery Terminal Definition 20 2 3 Low Voltage DIP Switch Settings 20 2 3 1 Stand Alone Battery 21 2 3 2 Parallel Connection Master Slave 1 21 2 3 3 Parallel Connection Master Slave 1 Slave 2 21 2 3 4 Parallel Connection Master Slave 1 Slave 2 Slave 3 21 2 3 5 Parallel Connection Master Slave ...

Page 4: ...stallation Tools 46 3 1 5 Personal protective equipment 47 3 2 High Voltage Module Wiring and Set Up 48 3 2 1 Battery Connections 48 3 2 2 Battery Terminal Definition 49 3 3 High Voltage Module Configuration HV Box 750Vdc 50 3 4 High Voltage DIP Switch Settings 51 3 4 1 Serial Tower Connection 1 Set Up of the HV box CAN Communication Loop 52 3 5 Serial Battery Wiring Connections 53 3 5 1 High Volt...

Page 5: ...t version of firmware WeCo will release new firmware to improve the functionalities and battery capabilities from time to time The latest version of the firmware is always available free of charge and can be updated by your local installer You can also write an email to service weco uk com to understand the upgrade procedure ATTENTION This battery model is designed to be used indoors The STANDARD ...

Page 6: ... used only by qualified installers who must read carefully and always refer to the manual for guidance on correct operation and maintenance of the product Use Range This installation guidance applies for the High Voltage and Low Voltage Inverters Make sure to identify the correct inverter charging parameters before connecting to the battery Each 5k3 LV HV module has two different circuits and acco...

Page 7: ...h the safety precautions and observe all warnings as detailed in this document If any of the safety precautions or procedures detailed in this manual is not fully understood by the reader the reader must not perform any operation on the battery until they have contacted the WeCo customer service officer for clarification and confirmation of understanding of the correct procedure The safety guideli...

Page 8: ...connecting cables should be as short as possible to prevent excessive voltage drops Batteries with different capacity different type model or design or from different manufacturers cannot be connected together 1 Before connecting the battery the battery positive and negative poles need to be carefully checked to ensure correct installation 2 The installation location must be on a flat ground in a ...

Page 9: ...ction 3 of this manual SECTION 1 INSTALLATION PRE OPERATIONAL PROCEDURES 1 1 Module Handling and Lift Out from Box The battery is always delivered in WALL mode and it is therefore necessary for the installer to make simple changes to install the STACK kit Below are the installation phases ATTENTION The battery must be lift by 4 persons by using the 4 handles 2 Handles are inbuilt and the other two...

Page 10: ...o ensure that they are free from damage Refer to Section 2 1 3 for Low Voltage packing list and to Section 3 1 3 for High Voltage packing list 1 2 Wall Mount or Stack Mount Configuration NOTE The LV HV 5K3 battery module ships as standard in the wall mount configuration 1 2 1 Battery Dimensions 1 2 2 Wall Mount Step 01 Install the wall bracket by using the wall plugs and screws contained in the ba...

Page 11: ...ust be flush to the wall without any empty spaces between the wall surface and the back side of the bracket Make sure to have adequate space to install the battery before proceeding with the installation Step 02 Install the battery by fitting the back bracket of the module with the wall bracket interlocking This operation must be conducted with a mechanical lifting device and or with at least thre...

Page 12: ...nstalled with the help of a mechanical lift and or with at least two people equipped with suitable suction cups for mechanical lifting or lifting straps As previously stated in this manual the 5K3 module comes as standard in wall mount configuration To install in the Stackable configuration the screws on the back of the battery module must be removed 1 Remove the back side wall support plate using...

Page 13: ... civil engineer For vertical ground mounted the support surface of the battery is distributed on 4 feet 10x4 cm make sure to install a distribution plate or make a proper foundation to support the weight In case of horizontal installation the installer must prepare an adequate distribution plate on the floor in order to make a safe and stable support for the pile of batteries Make sure the support...

Page 14: ...S LV PARALLEL ID SET UP and HV ADDRESS PATH D RS 485 A LV LOW VOLTAGE COMMUNICATION PORT RS 485 E CAN A CAN BMS to LOW VOLTAGE INVERTER F D I Digital Input G D O Digital Output H CAN B HIGH VOLTAGE SERIAL IDENTIFIER RJ45 CAN PORT I RS 485 LV LOW VOLTAGE COMMUNICATION PORT RS485 L HV POLE HIGH VOLTAGE POSITIVE Fast Connector Terminal for serial connection M HV POLE HIGH VOLTAGE NEGATIVE Fast connec...

Page 15: ...ou should not attempt any further operation of the battery and contact WeCo support on service weco uk com There is also an RS232 monitoring Port which will allow you to check all parameters of the battery module Full instruction on how to interface to the RS232 Port can be found in this manual Attention At this stage after you have determined that the battery is functioning correctly it is mandat...

Page 16: ... in this document Use of this product other than as described in this document will nullify the product guarantee The substitution or installation of any components of this battery will nullify the product guarantee The use of any components contained within or connected to this battery other than the products sold as part of this product or recommended by the manufacturer will nullify the product...

Page 17: ...y is packed in a carton together with standard accessories When unpacking the battery be sure to check that the battery and accessories are free from damage and that the correct quantities of each component are included within the carton The following list of components can be used as a check list when unpacking the individual battery and battery kits Number Name Quantity Description Image 1 Power...

Page 18: ...Nov 2020_LV HV 2 1 4 Necessary Installation Tools Multimeter Current clamp Screw Driver Set Allen Key Set Drill Hammer Electrician Scissors Wrench set Lifting strap mechanical lifter RS 232 USB screw terminal insulated 2 1 5 Personal Protective Equipment ...

Page 19: ...cted to the WeCo assistance team and the protection lid cannot be opened by anyone apart from WeCo The same applies to the HV fuse LOW VOLTAGE CONNECTION TERMINAL REMOVE THE STEEL CAP TO OPERATE AS LOW VOLTAGE LEAVE THE PROTECTION CAPS TO PROTECT THE HV FAST TERMINAL HV TERMINALS LOW VOLTAGE TERMINAL BLOCK COMM BOARD LOW VOLTAGE FUSE Behind Panel Do not Open HIGH VOLTAGE FUSE Behind Panel Do not O...

Page 20: ...TED FOR THE CHANGES TO TAKE EFFECT POWER CABLE CONNECTIONS MUST BE MADE IN STRICT ACCORDANCE WITH THE INSTRUCTIONS IN THIS MANUAL INCORRECT POWER CONNECTIONS CAN DAMAGE THE BATTERY AND CAUSE INJURIES WHEN THE INVERTER HAS A CANBUS COMMUNICATION PORT SWITCH 5 OF THE MASTER BATTERY MUST ALWAYS BE SET TO ON MASTER Attention All drawings are for reference only always refer to the physical product as t...

Page 21: ...1 CAUTION After setting the DIP switches the batteries must be restarted for the DIP switch changes to take effect 2 3 3 Parallel Connection Master Slave 1 Slave 2 MASTER SLAVE 1 SLAVE 2 CAUTION After setting the DIP switches the batteries must be restarted for the DIP switch changes to take effect 2 3 4 Parallel Connection Master Slave 1 Slave 2 Slave 3 MASTER SLAVE 1 SLAVE 2 SLAVE 3 CAUTION Afte...

Page 22: ... Screws Cables and Bus Bar POWER CONNECTIONS must be installed with due diligence and the tightening of the connection terminal must be to 40Nm Each terminal should be inspected and its torque checked every 3 months Attention All drawings are for reference only always refer to the physical product as the standard If the manual does not match the physical product stop all actions remove any connect...

Page 23: ...city and peak In case of parallel the parallel battery and inverter can only communicate through CAN interface and the communication between the batteries will be through RS485 Attention Be sure to follow the above method of daisy chaining the RS 485 connections starting at Port B on the upper battery module then into Port A on the next module and our of Port B then into Port B on the next module ...

Page 24: ... always paying attention to minimize the length of the cables to avoid voltage drops Attention On the top battery module keep the original connection HUB cover Attention Install the stackable flat front cover plate to protect the bus bar and cables BEFORE TURNING ON Battery installed correctly see image below Suggested Cable Output from the Upper Side ...

Page 25: ...tery Name Meaning Function or indication status POWER BUTTON On Off Button Switches the Battery Module on and off RUN Running indicator light GREEN When the battery box is running normally it always bright LOW BATTERY Low battery indicator YELLOW When the battery is low SOC 0 10 it is always bright FAULT Fault indicator light RED When there is a fault with the battery module it will flash RED A 2 ...

Page 26: ... please always refer to the physical battery module in front of you and if the module has a different configuration to this manual stop all activity immediately and contact WeCo support on service weco uk com 2 5 1 2 LED Bar Indications The LED bar is located on the front of the battery and is purely a visual indication ...

Page 27: ...gain During the forced charging period the low battery LED will be steady orange up to an SOC of 10 at which point the low battery LED will go out 2 5 3 Parallel Battery Configuration 1 The voltage difference between any of the batteries in the stack must not be greater than 2V Otherwise the BMS will not allow the batteries to be activated in a parallel connection 2 SOC of each battery in the stac...

Page 28: ...vated normally Now all parallel batteries are activated normally and the parallel system is properly powered on 2 5 3 2 Shutdown of Parallel Batteries Long press the Master Power button for five seconds The GREEN RUN light should go off immediately The GREEN RUN lights on the slave batteries will not be extinguished immediately The RED FAULT lights on the slave batteries will start flashing after ...

Page 29: ... Page 29 of 69 V_1 1_21 Nov 2020_LV HV 2 6 LV Product Compatibility List Maximum Modules Permitted per Cluster 2 6 1 Direct Parallel with CAN Communication Protocols developed by WeCo Protocols provided by the Inverter Manufacturer ...

Page 30: ...F Inverter High Voltage CUT OFF STD Charging Current max 120A STD Discharging current Max 200A 2sec Single Battery 49 5 SOC 0 Suggested 51 3 SOC 10 if OFF GRID 55 4 Suggested 54 5 Absortion 10A 100A 100A Master Slave1 Master SL1 SL2 Master SL1 SL2 SL3 Master SL1 SL2 SL3 SL4 TEMPERATURE C RATE 1C Overload 0 5C CHARGE 8 C 55 C 9 C 15 C DISCHARGE 20 C 55 C 56 C 65 C CHARGING CURVE SET Charge 0 to 90 ...

Page 31: ...31 of 69 V_1 1_21 Nov 2020_LV HV 2 7 Overview of Multi Cluster System Double BUS BAR 40 Nm Parallel Screw Terminal must be checked every 3 months 2 x 50mm NEGATIVE 2 x 50mm POSITIVE COPPER BUS BAR 360A PARALLEL CONNECTION MASTER CAN BMS ...

Page 32: ...HE POWER CURRENT CONFIGURATION BELOW Each battery pack and each cluster must have the same soc Above 120a must use the bus bar provided by WeCo order ref stk 5k3 300 Each cluster must have the same number of battery packs This BMS BMU Master Hub is mandatory when more than one cluster is connected on a common bus bar The Master HUB works only with CAN communication approved inverters ...

Page 33: ...B DIP SWITCH Baud Rate Selection C CAN BUS PORTS 2X CAN Bus port for external solar grid charger D RS 485 port RS 485 communication port MODBUS E CLUSTER CAN PORTS 5X Master Cluster CAN port F ON OFF SWITCH Internal Power supply switch G INLET 48Vdc Connector for power input to connect to the bus bar 1A fuse protected H RS232 PORT External Port for programming and Debug I LED LIGHTS 4X 25 SOC stat...

Page 34: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 34 of 69 V_1 1_21 Nov 2020_LV HV 2 8 1 CAN Hub Dimensions Fix on the wall with 4 x 6mm screw washer 45 485 80 463 445 400 200 ...

Page 35: ... less than 3 seconds 6 The current limit must be adjusted according to the real active batteries in system in order to restore the normal function 7 If the cluster is not balanced the current limitation set from the HUB to the inverter will be sent in order to manage the rest of active modules and clusters in the same time the imbalanced modules or cluster will equalize in standby mode and will re...

Page 36: ...1 Nov 2020_LV HV 2 8 3 CAN Hub General System Description 2 8 3 1 CAN Hub is Mandatory for Multiple Cluster Installation NEGATIVE BUS BAR POSITIVE BUS BAR 2 x 50mm NEGATIVE 2 x 50mm POSITIVE 2 x 50mm NEGATIVE 2 x 50mm POSITIVE MASTER CAN of EACH CLUSTER ...

Page 37: ... Bar for Parallel Configuration BUS BAR MODEL STK 5K3 360 ATTENTION BUS BAR ARE MANDATORY FOR STACK SYSTEM ATTENTION DO NOT USE DIFFERENT BUS BAR TYPES OR CABLES ATTENTION EACH BATTERY AND EACH CLUSTER MUST HAVE THE SAME SOC and VOLTAGE ALL THE BATTERY MODULES MUST HAVE THE SAME FIRMWARE ...

Page 38: ... available in the Download Area of WeCo s Web Site www wecobatteries com 3 4 Install the Specific FW on each battery the Cluster Connection FW has a nomenclature starting with 4 xx see web site 5 Set the Cluster ID using the WeCo monitor Cluster Software 6 Connect the HUB pre configured by WeCo at the Order in case the installers needs to change the Number of modules per cluster or change the MAST...

Page 39: ...9 V_1 1_21 Nov 2020_LV HV Cluster 1 of 5 Cluster 2 of 5 Cluster 3 of 5 Cluster 4 of 5 Cluster 5 of 5 More inverter Max 360A SLAVE SLAVE SLAVE MASTER 2 x 50mm NEGATIVE 2 x 50mm POSITIVE Cluster 1 of 5 Cluster 2 of 5 Cluster 3 of 5 Cluster 4 of 5 ...

Page 40: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 40 of 69 V_1 1_21 Nov 2020_LV HV HUB power supply Line ...

Page 41: ... STK 5K3 360 1 x Custom BUS BAR Insulated RED module connection 1 x Custom BUS BAR Insulated BLACK module connection Packed in single box Note MAIN PARALLEL BUS BAR ARE NOT PROVIDED BY WECO 2 8 5 2 Multi Cluster Hub Device KIT ORDER CODEMASTER HUB 300 LV 5 HIGH CURRENT KIT MASTER HUB 300 LV 5 Accessory to ordered separately 1 x WeHUB parallel Controller Packed in carton box 1 x WeHUB cable power s...

Page 42: ...K3 Individual Module Setting Nominal DC Voltages 51 2 Amp Hours 102 Rated kWh Capacity 5 3 kWh Max Output Capacity 102 Ah Standard Charge Current 100 Adc Max Charge Current 120 Adc Peak Standard discharging Current 100 Adc Max discharging Current 200 Adc Peak 2sec DC Voltage extreme 46 5 58 7 Depth of Discharge Up to 100 suggested 95 Operating Efficiency 98 Operating Temp 25 to 65 C Charging Temp ...

Page 43: ...1 Nov 2020_LV HV SECTION 3 HIGH VOLTAGE CONFIGURATION SERIAL CONNECTION AND SYSTEM CONFIGURATION HIGH VOLTAGE STACKABLE CONFIGURATION ATTENTION THIS SECTION IS FOR HIGH VOLTAGE CONFIGURATION ONLY IT IS COMPULSORY TO USE THE HV BOX FOR THIS CONFIGURATION ...

Page 44: ...ntained within or connected to this battery other than the products sold as part of this product or recommended by the manufacturer will nullify the product guarantee ATTENTION do not exceed the number of 6 modules each tower ATTENTION The maximum number of batteries that can be connected in series is 12 ATTENTION The HV BOX is a compulsory protection and communication device that must be installe...

Page 45: ...ate label describes the product parameters and is attached to the product For details please refer to the nameplate label of the product For safety reasons the installer must have a thorough understanding of the contents of this manual before installing the product Front Cover Insulated Supports Battery Module Retractable Handles Plug In Handles Power Button ...

Page 46: ...mponents can be used as a check list when unpacking the individual battery and battery kits Number Name Quantity Description Image 1 Power Cable 2 2x25mm AWG cable 2 5 m each Red Black 2 CAN cable RJ45 Parallel Connection 1 100cm 3 Flat Cover 1 Flat Cover for Bus bar protection in Stackable configuration 4 Earthing Screw 1 M5 Allen key 5 BMS STD 1 1 BMS std Cable 100cm 3 1 4 Necessary Installation...

Page 47: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 47 of 69 V_1 1_21 Nov 2020_LV HV 3 1 5 Personal protective equipment ...

Page 48: ... assistance team and the protection lid cannot be opened by anyone apart from WeCo The same applies to the HV fuse LOW VOLTAGE CONNECTION TERMINAL LEAVE THE STEEL CAP IN PLACE TO OPERATE AS HIGH VOLTAGE REMOVE THE PROTECTION CAPS TO OPERATE AS HIGH VOLTAGE HV TERMINALS DO NOT REMOVE THE LOW VOLTAGE TERMINAL PROTECTION PLATE COMM BOARD LOW VOLTAGE FUSE Behind Panel Do not Open HIGH VOLTAGE FUSE Beh...

Page 49: ... Address HUB LV PARALLEL ID SET UP D RS 485 A LV LOW VOLTAGE COMMUNICATION PORT RS 485 E CAN A CAN BMS to LOW VOLTAGE INVERTER F D I Digital Input G D O Digital Output H CAN B LINK IN OUT I RS 485 B LV LOW VOLTAGE COMMUNICATION PORT RS485 L HV POLE HIGH VOLTAGE POSITIVE Fast Connector Terminal for serial connection M HV POLE HIGH VOLTAGE NEGATIVE Fast connector Terminal for serial connection N GND...

Page 50: ...LV HV 3 3 High Voltage Module Configuration HV Box 750Vdc ATTENTION The High Voltage mode mandates that the battery modules must be connected in series ATTENTION The following table provides the possible module configurations NO OTHER configurations are permitted ...

Page 51: ...ST ALWAYS BE RESTARTED FOR THE CHANGES TO TAKE EFFECT POWER CABLE CONNECTIONS MUST BE MADE IN STRICT ACCORDANCE WITH THE INSTRUCTIONS IN THIS MANUAL INCORRECT POWER CONNECTIONS CAN DAMAGE THE BATTERY AND CAUSE INJURIES ATTENTION All drawings are for reference only always refer to the physical product as the standard If the manual does not match the physical product stop all actions remove any conn...

Page 52: ...et Up of the HV box CAN Communication Loop Three batteries connected in series is the minimum allowed configuration for High Voltage operation CAUTION After setting the DIP switches the batteries must be restarted for the DIP switch changes to take effect Power cables Connection COMM cables connection ...

Page 53: ... connection terminal must be to 40Nm Each terminal should be inspected and its torque checked every 3 months Attention All drawings are for reference only always refer to the physical product as the standard If the manual does not match the physical product stop all actions remove any connections and store the batteries in a safe place call WeCo product assistance for support Attention Power cable...

Page 54: ...ces and guidelines as described Section 1 of this manual 3 5 1 2 Connect the power cables as indicated making sure that the batteries are OFF check the button LED on the bottom 3 5 1 3 Do not connect the HB box to the inverter input cables and do not turn on the HV BOX breaker before the serial connection completion Do Not Connect the Inverter until the HV box is completely set up Do Not Connect t...

Page 55: ...the CAN and Link ports starting from the HV BOX port CAN A and LINK then chain connection as shown below The HV BOX must be set up before turning it on the DIP addresses must follow the picture below to enable the CAN communication The last module of the series must be terminate by addressing the module as shown in the picture to ends the CAN line HV BOX BATTERY MODULE END OF SERIES ...

Page 56: ...ll modules and the HV box with a 6mm earthing cables In Out by using the GND connections point Make sure that the ground connection is not shared with others potentials disturbing devices and that the ground rod is not used for Neutral Line dispersion or Harmonics mitigation circuit ...

Page 57: ...put circuit The Orange LED and the Green light will turn on by confirming the working status of the HB BOX Step 6 Each module will turn on automatically and the side button will blink for 3 seconds then a fixed green light will confirm the run status of each module If one or more modules will not turn on automatically means that the LINK CAN connection between modules or the DIP address of one or ...

Page 58: ...en is possible WeCo suggest to reduce the CAN cable length in order to minimize the disturbs generated by the Electromagnetic devices nearby the inverter and the batteries The cable provided it is crimped with a an RJ45 plug type 568B on one side while on the inverter end WeCo Provides naked terminals to facilitate the connection with the ZCA AZZURRO terminal CAN INVERTER CONNECTION Pin Definition...

Page 59: ...eaker Step 6 Wait for the startup completion of the power box Green LED and then turn on the Inverter CAUTION There are two different type of HV BOX make sure to identify yours by inspecting the product label on the back side of the enclosure If your S N is included the below list you must follow the section set up method defined in the Section A 38 Serial Number List BATCH 38 2020 BATCH 38 2020 H...

Page 60: ...0 0 0 0 0 and plug the termination into the port CAN 2 A SINGLE HV BOX BATCH 38 Step1 Turn your HV BOX Off and connect the CAN cable into the port CAN 1A Step 2 Plug the RJ45 termination provided with the kit into the port CAN 2A Step 3 Turn on the HV BOX and the solar inverter ADDRESS CAN TO INVERTER PLUG THE CAN TERMINATION 120 Ω SINGLE CLUSTER WITH CAN ADDRESS 00 Ω ...

Page 61: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 61 of 69 V_1 1_21 Nov 2020_LV HV COUPLE OF HV BOX ADDRESSED 00 and 01 BATCH 38 CLUSTER ADDRESS 00 LINK INVERTER CAN CLUSTER ADDRESS 01 ...

Page 62: ... with a new HV BOX with Batch Number higher than 40 If you have an existing system BATCH 38 and you are going to expand the system capacity with a new HV BOX m BATCH 40 or Above you can follow the instruction below to successfully set up you system CLUSTER ADDRESS 00 CLUSTER ADDRESS 01 38 40 or Above ...

Page 63: ...f your HV BOX is part of the batch 40 or above make sure to set the DIP switch terminal to 0 0 0 0 0 0 1 0 Connection and Settings for HV BOX Batch 40 or Above SINGLE HV BOX CAN TO INVERTER SINGLE CLUSTER WITH CAN ADDRESS 00 Ω DON NOT USE THE RJ45 RESISTOR FOR THIS BATCH ...

Page 64: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 64 of 69 V_1 1_21 Nov 2020_LV HV 3 5 4 MULTI HV BOX CONNECTION BATCH 40 or ABOVE HV BOX ADDRESS 0 HV BOX ADDRESS 1 LINK RJ45 CAN to INVERTER ADDRESS 00 ADDRESS 00 ...

Page 65: ...WeCo 5K3 LV HV HeSU 5K3 LV HV Page 65 of 69 V_1 1_21 Nov 2020_LV HV 3 6 HV BOX ADDRESS ALL BATCHES ...

Page 66: ...llustrations shown are for reference only please always refer to the physical battery module in front of you and if the module has a different configuration to this manual stop all activity immediately and contact WeCo support on service weco uk com 3 6 2 Stand Alone Battery Front Panel Control FORCED CHARGE 3 6 2 1 Start Battery Press the power button of the HV BOX for 3 or more seconds depends b...

Page 67: ...of the battery box to ensure charging capacity Forced charging approach Short press the battery power button the battery RUN light will flash green which means that the battery is entering the compulsory charging mode If the battery receives an adequate charging power above 10 Amps 58V within 90 seconds from pressing the button the battery will continue to charge normally until a stable state is r...

Page 68: ... Direct Serial with CAN Communications for each HV Box Number Inverter brand Inverter model UNITS PER CLUSTER max HeSU 5 3 LFP with HV BOX 750Vdc 01 ZCS Azzurro HYD 10000 12 12 x 5 2kWh x 9 Clusters 561 kWh 02 HYD 15000 12 03 HYD 20000 12 A T T E N T I O N DO NOT EXCEED THE MAXIMUM VOLTAGE OF 750Vdc DO NOT CONNECT MORE THAN 12 MODULES IN SERIES ...

Page 69: ...15 C DISCHARGE 20 C 50 C 55 C 65 C CHARGING CURVE SET Charge 0 to 90 Discharge 100 90 Charge 90 100 Discharge 10 0 CHARGING 100A 20A DISCHARGING 100A 20A ATTENTION The charge and discharge current of the inverter MUST be limited according with the maximum current allowed by each cluster configuration The charge and discharge Voltage range of the inverter MUST be limited as per the module maximum v...

Reviews: