![background image](http://html1.mh-extra.com/html/watts/aerco-inn-1060n/aerco-inn-1060n_installation-operation-and-maintenance-manual_877211017.webp)
Innovation - Edge [i] Installation, Operation, Maintenance Manual
CHAPTER 2
– INSTALLATION
OMM-0143_A
• GF
-216
•
9/6/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 17 of 170
CAUTION!
While packaged in the shipping container, the unit must be moved by pallet jack or forklift
from the FRONT ONLY.
FOR MASSACHUSETTS ONLY
For Massachusetts installations, the unit must be installed by a plumber or gas-fitter who is
licensed within the Commonwealth of Massachusetts. In addition, the installation must
comply with all requirements specified in Chapter 1, Section 1.4, above.
2.4.2 Setting the Unit
The unit must be installed on a
4 to 6-inch (10.2 to 15.2 cm)
level housekeeping pad to avoid
base corrosion. Two lifting lugs are provided with the unit and are wire-tied to the top of the heat
exchanger. The top sheet metal cover of the unit must first be removed and the lifting lugs must
be installed as shown in Figure 2.4.2. USE THESE TWO LUGS TO LIFT AND MOVE THE
UNIT. Remove the top panel from the unit to provide access to the lifting lugs. Remove the four
(4) lag screws securing the unit to the shipping skid. Lift the unit off the shipping skid and
position it on the 4 to 6-inch (10.2 to 15.2 cm) housekeeping concrete pad (required) in the
desired location.
In multiple unit installations, it is important to plan the position of each unit in advance. Sufficient
space for piping connections and future service/maintenance requirements must also be taken
into consideration. All piping must include ample provisions for expansion
.
Figure 2.4.2: Partial Top View Showing Installed Lifting Lugs
LIFTING LUGS