
Setting up a run
3-23
The following screen shows a 30-minute trace of simulated peaks.
30-minute scaled trace of continuous, simulated peaks, with T1 changed
to -30
The following screen shows a 5-minute, scaled trace (or zoom) of the 30 screen
shown above. T1 is changed to -5. T2 is changed to 0. LSU1, and LSU2 remain
as auto-scaled.
Scaled trace for 5 minutes changing T1 to -5
The following screen shows a 30-minute, scaled trace similar to that shown in
the first screen, with the starting light scattering or LSU1 changed from
auto-scaled to -10. T1 remains at -30, T2 at 0.
Scaled trace for 30 minutes changing LSU1 to -10
T2
T1
LSU2
LSU1
T2
T1
LSU2
LSU1
T2
T1
LSU2
LSU1
Summary of Contents for 2424
Page 8: ...viii...
Page 30: ...1 16 2424 ELS Detector Optics Principles...
Page 64: ...2 34 Setting up the Detector...
Page 110: ...3 46 Operating the Detector...
Page 126: ...4 16 Maintaining the Detector...
Page 182: ...A 14 Safety Advisories...
Page 186: ...B 4 Specifications...
Page 196: ...Index 10...