
2-4
Setting up the Detector
Site selection requirements
Install the detector in an area that meets the requirements in the table at the
end of this section.
The detector is a stackable unit and does not require bench space beyond the
dimensions shown in the figure on
.
Place the detector close to the column outlet to minimize band broadening,
which reduces the resolution of a chromatogram.
Tip:
If your system includes more than one detector, connect the ELS detector
so that it is the final detector in the series because it nebulizes column effluent
and exhausts it as gas vapor.
Caution:
To avoid damaging the detector, the amount of weight stacked
on top of it should not exceed 18 kg (40 pounds).
Installation site requirements
Parameter
Requirement
Operating temperature
range
4 to 30 °C (39.2 to 86 °F); avoid direct exposure
to sunlight and heating and cooling vents
Storage temperature
range
-30 to 60 °C (-22 to 140 °F))
Relative humidity
20 to 95%, noncondensing
Storage humidity range
0 to 95%, noncondensing
Bench space
At least 33.53 cm (13.2 inches) wide
×
66.04 cm
(26 inches) deep
×
20.8 cm (8.2 inches) high
(includes 15.0 cm [6 inches] clearance at the
rear and 5 cm [2 inches] clearance on the left for
ventilation)
At least 5 cm (2 inches) clearance is needed on
the left side of the detector to allow venting for
nebulizer cooling. Blocking this vent could
adversely affect nebulizer cooling.
Power
Grounded AC, 100 to 240 VAC,
50 to 60 Hz nominal 200 VA
Summary of Contents for 2424
Page 8: ...viii...
Page 30: ...1 16 2424 ELS Detector Optics Principles...
Page 64: ...2 34 Setting up the Detector...
Page 110: ...3 46 Operating the Detector...
Page 126: ...4 16 Maintaining the Detector...
Page 182: ...A 14 Safety Advisories...
Page 186: ...B 4 Specifications...
Page 196: ...Index 10...