HI 110 / 200 / 300
Lifting and Transporting
ghi_tx001446gb.fm
19
3
Lifting and Transporting
3.1
Lifting and Transporting the Machine
Requirements
Transport vehicle capable of carrying 1000 lbs (454 kg)
Crane or lift capable of carrying 1000 lbs (454 kg)
Background
NOTICE:
These machines are NOT designed to be towed with any vehicle.
Guidelines
Follow the guidelines below when lifting and transporting this machine.
Remove all venting from the machine prior to lifting/transporting.
Cover all openings on the machine to avoid infiltration from road debris and dust.
Except for the HI 300HD, use all four lifting points on the sides of the machine
when using an aerial lifting rig.
When using an aerial lifting rig on the HI 300HD, use the designated lifting point
on top of the machine.
HI 300HD only: Use the designated fork pockets when transporting the machine
with a fork lift.
Use the manual transport handle when relocating the machine within the job site.
When tying down the machine, route tie-down straps or chains through the
lower frame only.
NOTICE:
Do not route tie-down straps or chains over the top of the machine.
Doing so will damage the machine. Use only the designated tie-down locations.
WARNING
Crushing hazard.
f
Only qualified riggers should attempt aerial lifting of this machine.