50Hz Mobile Generators
Maintenance
wc_tx000885gb.fm
43
4.10 Cleaning the Engine
Prerequisites
Engine off
Engine cool
When
Every 1000 hours of service or yearly
Procedure
Follow the procedure below to clean the engine.
1. Cover electric/electrical components and connection: alternator, starter, gover-
nor, solenoid.
2. Blow compressed air through the engine stating with the exhaust side. Take
care not to damage cooling fins of cooling system.
3. Cold water jet or steam cleaning is allowed. Limit pressure to 60 bar and tem-
perature to 90°C.
4. Remove the covering from electric/electrical components installed in step 1.
5. Start engine and allow remaining water to evaporate.
Note:
Refer to the Deutz engine manual for detailed information on maintaining the
engine.
Summary of Contents for G 43
Page 1: ...Mobile Generator G 43 OPERATOR S MANUAL 0175257en 001 0608 0 1 7 5 2 5 7 E N...
Page 2: ......
Page 4: ...Foreword G 43 wc_tx000898gb fm 4...
Page 13: ...50Hz Mobile Generators Safety Information wc_si000271gb fm 13 Notes...
Page 18: ...Transporting Lifting and Storing 50Hz Mobile Generators wc_tx000895gb fm 18 Notes...
Page 48: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 48 5 Schematics 5 1 Power Wiring...
Page 50: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 50 5 3 Engine Wiring...
Page 52: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 52 5 5 Socket Wiring...
Page 54: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 54 5 7 Control Wiring...
Page 57: ...50Hz Mobile Generators Basic Troubleshooting wc_tx000896gb fm 57...
Page 60: ...Technical Data G 43 wc_td000277gb fm 60 7 3 Dimensions...
Page 62: ......
Page 64: ......