50Hz Mobile Generators
Maintenance
wc_tx000885gb.fm
39
4.6
Air Cleaner Discharge Valve
Prerequisites
Engine off
Machine cool
When
Every 250 hours of service or every 3 months
Procedure
Follow the procedure below to empty the air cleaner discharge valve.
1. Empty the air cleaner discharge valve (1) by pressing apart the lips of the dis-
charge slot as indicated by the arrows.
2. Remove any caked dirt by pressing together section of valve.
Note:
Refer to the Deutz engine manual for detailed information on maintaining the
engine.
Summary of Contents for G 43
Page 1: ...Mobile Generator G 43 OPERATOR S MANUAL 0175257en 001 0608 0 1 7 5 2 5 7 E N...
Page 2: ......
Page 4: ...Foreword G 43 wc_tx000898gb fm 4...
Page 13: ...50Hz Mobile Generators Safety Information wc_si000271gb fm 13 Notes...
Page 18: ...Transporting Lifting and Storing 50Hz Mobile Generators wc_tx000895gb fm 18 Notes...
Page 48: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 48 5 Schematics 5 1 Power Wiring...
Page 50: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 50 5 3 Engine Wiring...
Page 52: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 52 5 5 Socket Wiring...
Page 54: ...Schematics 50Hz Mobile Generators wc_tx000886gb fm 54 5 7 Control Wiring...
Page 57: ...50Hz Mobile Generators Basic Troubleshooting wc_tx000896gb fm 57...
Page 60: ...Technical Data G 43 wc_td000277gb fm 60 7 3 Dimensions...
Page 62: ......
Page 64: ......