Chapter 5, Operating Instructions: Single Point Operation
E.H. Wachs
Part No. 81-MAN-00, Rev. 0-0610
73
Push the machine forward
while turning the feed handle
to start the threads.
4.
When the machine is fully engaged on the spline,
lower the lifting device slightly to take the tension off
it.
5.
When the machine is as far forward as it will go, turn
the feed handle clockwise to engage the mandrel
threads in the feed nut.
6.
Turn the feed handle clockwise until the end of the
mandrel emerges from the back of the machine. Feed
the machine until at least 1/2” (13 mm) of threads on
the mandrel are visible.
Figure 5-65. Engage the mandrel threads fully in the
feed nut for stable operation.
7.
Install the autofeed stop plate on the end of the man-
drel. The stop plate prevents the machine from auto-
feeding all the way off the mandrel.
8.
Using a 3/16” hex wrench, loosen the tooling set
screws in the male slide and put the tool holder with
the tool in the slide. Tighten the set screws.
NOTE
Summary of Contents for EP 424
Page 2: ...EP 424 End Prep Machine Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 8: ...EP 424 End Prep Machine 4 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 14: ...EP 424 End Prep Machine 10 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 92: ...EP 424 End Prep Machine 88 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 98: ...EP 424 End Prep Machine 94 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 100: ...EP 424 End Prep Machine 96 Part No 81 MAN 00 Rev 0 0610 E H Wachs...