![Wachs EP 424 User Manual Download Page 49](http://html2.mh-extra.com/html/wachs/ep-424/ep-424_user-manual_3102862049.webp)
Chapter 5, Operating Instructions: Mounting the Mandrel on the Pipe
E.H. Wachs
Part No. 81-MAN-00, Rev. 0-0610
45
17.
Tighten the set screws in the indicator collar to hold it
in place on the mandrel.
Figure 5-22. Position the collar near the pipe surface
and tighten the set screws to hold it in place.
18.
Assemble the indicator and set the magnetic mount
onto the indicator mounting collar. Turn the magnet on
to hold the indicator in place.
Figure 5-23. Set the magnetic base of the indicator on
the collar, and turn the switch on to engage the mag-
net.
19.
Position the tip of the indicator to touch the pipe sur-
face. You can indicate on either the O.D. or the I.D. of
the pipe, depending on where the operation needs to
be centered.
Summary of Contents for EP 424
Page 2: ...EP 424 End Prep Machine Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 8: ...EP 424 End Prep Machine 4 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 14: ...EP 424 End Prep Machine 10 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 92: ...EP 424 End Prep Machine 88 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 98: ...EP 424 End Prep Machine 94 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Page 100: ...EP 424 End Prep Machine 96 Part No 81 MAN 00 Rev 0 0610 E H Wachs...