40
CIP - Phase 4: Reassemble
24. Reconnect the syrup lines and bags of
syrup by pressing the syrup bag connector
onto the bag fitment.
25. Install the duckbill check valve into the
syrup line manifold and the syrup line
manifold into the coupler body.
26. Carefully align the pins of the syrup line
manifold with the syrup line connector and
insert the end of the 9-Tube Assembly fully
into the Coupler.
27. Push the coupler nut into the coupler body
and rotate the coupler body until motion
stops to secure.
28. Install the cap on the manifold.
29. Perform the “Assembling the Injector
Assembly” and “Installing the Injector
System” sections of the DAILY OPENING
PROCEDURES.
30. Empty and discard the remaining Stera-
Sheen sanitizer solution from the tank.
Rinse it out with water. Refill the sanitizer
tank with Envirokleen No-Rinse Cleaner in
the following section “Filling the Sanitizer
Tank”.
31. Prime the syrup system as instructed in
“Priming the Syrup System.”
Summary of Contents for Stoelting Flavor Burst STL-80SS-DLX
Page 2: ......
Page 9: ...6 PAGE INTENTIONALLY LEFT BLANK ...
Page 11: ...8 General System Overview Figure 1 ...
Page 13: ...10 Outer Cabinet Continued Figure 2 ...
Page 15: ...12 Inner Cabinet Continued Figure 3 ...
Page 19: ...16 Syrup Pump and Related Parts Figure 5 ...
Page 21: ...18 Sanitizer Pump and Related Parts Figure 6 ...
Page 25: ...22 Spare Parts Kit Figure 8 ...
Page 26: ...23 PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...35 PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...67 PAGE INTENTIONALLY LEFT BLANK ...
Page 79: ......
Page 80: ......